Notice of Violation from Insp on 801124-1231
ML20004D840
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 01/20/1981
From: Robert Carlson, Carson R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20004D838 List:
References
50-443-80-13, NUDOCS 8106100202
Download: ML20004D840 (2)


Text

.

i i

APPENDIX A NOTICE OF VIOLATION t

Public Service Company of New Hampshire Docket No. 50-443 Seabrook Unit 1 License No. CPPR-135 As a result of the inspection conducted November 24 - December 31,1980, and in accordance with the Interim Enforcement Policy, 45FR65754 (October 7,1980), the following violation was identified:

10CFR50, Appendix B, Criterion III states, in part, that:

" Design changes, including field changes, shall be subject to l

design control measures comensurate with those applied to the original design and be approved by the organization that per-t i

formed the original design..."

The Seabrook Station PSAR for Units 1 and 2 states in part, in paragraph 17.1.3 that :

" Controls for changes,\\ including field changes, shall be commensurate with the controls applied to the original document." Furthermore, the PSAR states in paragraph 17.2.3 that notification to and approval by United Engineers and 3

Constructors (UE&C) Engineering is required for all field initiated design changes and that "UE&C Engineering will assure that the impact of the change is considered, (and) required t

actions documented..."

Bethlehem Stebl Drawings 016RW35AX (Revision 3) for the steam generator shield walls and 016RW38A (Revision 1) for the pressurizer shield wall incicate UE&C Engineering checks and approval on September 3 and August 28,1980 respectively, and illustrate the shield wall No. 9 rebar dowels as continuous bars out of the elevation 25' slab to the full height of the shield l

walls.

j t

Contrary to the above, during the period of time just prior j

to the elevation 25' slab concrete placement commencing on December 4,1980, approximately one thousand shield wall No. 9 rebar dowels were cut below the required design height without j

documented evidence of UE&C Engineering review or approval l

of this field initiated change.

This is a severity Level V violation (Supplement II)

Pursuant to the provisions of 10CFR2.201, Public Ser.i'.e Company of i

l l

t I

i l

I 8106100,20.2

  • -T

--T v

--ve-e

,,p_,

APPENDIX A 2

New Hampshire is hereby required to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid furcher violations; (3) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submit.ed under oath or affirmation.

I m

Dated

/ M 8/

/

/

Robert T. Carlson Chief, Reactor Construction and Engineering Support Branch

[