r7 o
UNITED STATiES g
n
- NUCLEAR REGULATORY COMMISSION 1
g s
rj WASHINGTON. D. C. 20555 June 3,1981 Docket No. 50-271 to e
6 A
f y
H JUtl05GBIP.\\
l IB Mr. Robert L. Smith Licensing Engineer D
v.5,,au* mx^'o" J.
Vermont Yankee Nuclear Power Corporation
.\\g[
1671 Worcester Road s
a Framingham, Massachusetts 01701 y
SUBJECT:
ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT RE:
YERMONT YANKEE NUCLEAR POWER STATION, FACILITY OPERATING LICENSE NO. DPR-28 Reference (a) - Order for Modifica. tion ofIicense Concerning the Environm ntal Qualification of Safety-Related Electrical Equipment dated October 24, 1980
Dear Mr. Smith:
i
.This letter transmits the Safety Evaluation for the Environmental Qualification of Safety-Related Electrical Equipment at your facility. This evaluation was based on your submittals dated June 2 and November 1,1980.
Our letter of February 20, 1981, which forwarded our preliminary results, indicated
. that an item-by-item re-evaluation would be required at a later date. This safety evaluation identifies the specific informatiort, required by the staff and the actions, on your part, necessary to comply with Reference (a).
We request that you provide the information identified in sections 3 and 4 'of this Safety Evaluation to us within 90 days.
This Safety Evaluation addresses only the safety-related electrical equipment exposed to a harsh environment resulting from an accident (i.e., the IEB 79-01B review).
Reference (a) requires that all safety-related electrical equipment be qualified by June 30, 1982. The NRC review effort for the equipment in mild environments will be addressed by separate correspondence.
Your response may presen,t alternatives to the staff positions in the evaluation.
The staff will consider alternative approaches if these methods are within
~.
the DDR Guidelines or NUREG-0588, as appropriate.
For example, an acceptable alternative to the NRC staff's. temperature criterion used for the service conditions (i.e. Section 3.3) must base that service condition on the FSAR analysis or other NRC approved analysis, provided that the specific analysis, together with reference to the previous NRC acceptance of that analysis, accompanies the 90 day response.
In addition, some of the information in the Safety Evaluatiorgay require clarification.
Co.ntact your project manager for assistance in these matters.
- slos100037 p
L
~ !
u, 1
It temains your responsibility to assure that the qualification deadline is met 'for al1 ~ safety-related electrical equipment. The staff's review of your response to this letter'should not delay any action which is required in
. order to meet the deadline.
~
Sincerely,
[b Ippolito. Chief Thoma Operating Reactors Branch #2 Division of Licensing
Enclosures:
l 1.
SER 2.
TER i
Ec w/ enc 1:
See next page-i.
. s..
k
\\
\\
4 S
e C
l O
i g
s
Mr. Robert _L. Smith cc:
Mr. W. FF Conway John R. Stanton, Director Vice President and Manager Radiation Control Agency of Operations Hazen Drive Vermont Yankee Nuclear Power Concord, New Hampshire 03301 Corporation P. O. Box 157 John W. Stevens Vernon, Vermont 05602 Conservation Society of Southern Vemont Mr. Louis H. Heider, V.P.
P. O. Box 256
~
Vemont Yankee Nuclear Power Townshend, Vemont 05353 Corocration Rayrrond H. McCandles's 25 xesearch Drive A..
. Radiation Control Procram Westboro, Massachusetts 01581 Occupational & Radiological Hith I
Administration Building John A. Ritscher, Esau1re Montpelier, Vermont 05602 Rooes & Gray
~
226 Franklin Street New England Coalition on Nuclear Boston, Massachusetts 02110 Pollution Hill and Dale Fam Laurie Burt-West Hill - Faraway Road Assistant Attorney General Putney, Vermont 05346 Environrental Protection Division Attorney General's Office Public Service Board One Ashburton Place,19th Floor State of Vemont Boston, Massachusetts 02108 120 State Street Montpelier, -Vemont 05602 Ronald J. Wilson E10 18th Street, N. W.
W. P. Murohy, Plant Superintendent Suite 802 Vermont Yankee Nuclear Power Washington, D. C.
20006 Coroot ation P. O. Box 157
' Honorable M. Jerome Diamond Vernon, Verment 05354 Attorney General State of Vemont-David White 109 State Street Co-Director Pavilion Office Building Vemont Public Interest Montpelier, Vermont 05502 Reserach Group, Inc.
43 State Street Mr. J. E. Griffin, President Montpeiler, Yemont 05602 Vermont Yankee Nuclear Power 77 Grove Street-
.~
Vermont Yankee Decommissioning Corocration Alliance Rutl and, - Vemont 05701 5 State Street C'
Box 1117 Vermont Yankee Decommioning Montpeli~er, Yemint 05602 l
Alliance 127 Main Street 3 rooks Memorial Library Brattleboro, Vemont 05301 224 Main Street Brattleboro, Yemont 05301
Mr. Robert L. Smith cc:
Resideht Inspector c/o U. S. NRC P. O. Box 176 Vernon, Vermont 05453 i
S e
9 m
m e
t
'h5 g C
8 7