ML20004D663
| ML20004D663 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 05/27/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| Shared Package | |
| ML20004D664 | List: |
| References | |
| NUDOCS 8106090629 | |
| Download: ML20004D663 (2) | |
See also: IR 05000546/1981005
Text
.
$2dA hk
.
/
'o,
UNITED STATES
!
j
NUCLEAR REGULATORY COMMISSION
,
REGION lli
"
e c
- -
l
799 ROOSEVELT ROAD
'ih
%,
,o[
GLEN ELLYN. ILLINOIS 60137
.....
May 27, 1981
9
!9//,
g
<
n(%'fD
Docket No. 50-546
gj
yQgL
Docket No. 50-547
-
j et! O S @ "
Public Service of Indiana
,
ATTN:
Mr. S. W. Shields
$f
p ig5"
Senior Vice President
cc d
/
4A" b_s',,<)' /
Nuclear Division
Post Office Box 190
f
New Washington, IN 47162
D 7
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. J. Harrison
of this office on April 1-30, 1981, of activities at Marble Hill Nuclear
Generating Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with
Messrs. Petro, Ramsett, and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative r.ecords, observations, and
interviews with personnel.
.
No items of noncompliance with NRC requirements were identifie i during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
- h
.
.
810 0 u v O Wk
<
.
.~
_
.
Public Service of Indiana
-2-
May 27, 1981
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Locument Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
R. F. Heishman, Acting Director
Division of Resident and Project
Inspection
Enclosure:
IE Inspection
Report No. 50-546/81-05
and No. 50-547/81-05
cc w/ encl:
W. M. Petro, Project
Director
C. Kammerer, CA
J. E. Sniezek, IE
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local PDR
LeBoeuf, Lamb, Leiby & MacRae
Dave Martin, Office of
Attorney General
John R. Galloway, Staff Director,
Environment, Energy and Natural
Resources Subcommittee
E. P. Martin, Wabash
Valley Power Association
f
RII
RIII
RII
RI
RI
s
rison/jp
Sch
inz
L ttl
Fi elli
H
shman
[gH
5/18/81
pg74