Forwards IE Insp Repts 50-445/81-05 & 50-446/81-05 During Apr 1981.No Noncompliance Noted
ML20004D464
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/21/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20004D465 List:
References
NUDOCS 8106090428
Download: ML20004D464 (2)


See also: IR 05000445/1981005

Text

-

-

-

/'

,

dd "4'

UNITED STATES

NUCLEAR REGULATORY COMMISSION

y..

,

'!

'

-

REGION IV

E

. ,,j

p

$11 RYAN PLAZA DRIVE. SUITE 1000

ARUNGTON. TEXAS 79011

_

,,

May 21, 1981

.In Reply Refer To:

,

RIV

e(h

Dockets: 50-445/Rpt. 81-06

g

V/, s

50-446/Rpt. 81-06

dEUlb,i

,

3 JUNO

~

b[ , 8. %, El*

Texas Utilities Generating Company

  • -
  • * ~ '

ATTN: Mr. R. J. Gary, Executive Vice

President and General Manager

?

2001 Bryan Tower

' '/ 7 ,

4

'

Dallas, Texas 75201

Gentlemen:

This refers tc,the inspection conducted by our Resident Reactor Inspo .or,

Mr. R. G.~ Tayhr, during April 1981, of activities authorized by NRC Construc-

tion Pemits CyPR-126 and CPPR-127 for the Cocanche Peak facility, Units 1 and

2, and to the discussion of our findings with Mr. R. G. Tolson and other reembers

of your staff at the conclusion of the inspection.

L

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

1

Within the scope of the inspection, no violations were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any infcmation that you

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within 10 days from the date of

this letter of your intention to file a request for withholding; and (b) sub-

mit within 25 days from the date of this letter a written application to this

office to withhold such information.

If your receipt of this letter has been

delayed such that less than seven days are available for your eniew, please

notify this office promptly so that a new due date may be established.

Consistent with Section 2.790(b)(1), any such application must be accompanied

by an affidavit executed by the owner of the infonnation wnich identifies the

document or part sought to be withheld, and which contains a full statement

of the reasons on the-basis which it is claimed that the infonnation should be

withheld from public disclosure. This section further requires the statement

.

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

,

The infonnation sought to be withheld shall be incorporated as far as possible

'

'

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, the report will be placed in

<

the Public Document Room.

O

81.06000 dO

s

.

.

-

_

-

..

.

.

_ . . . _ _ _ _ _ _ _ _

,. _ _ . - -

_

.

..

Texas Utilities Generating

2

May 21,1981

. Company

Should you have aity questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

$ '2?fo b

'

G. L. Madsen, Chief

Reactor Projects Branch

Enclosure:

IE Inspection Report No. 50-445/81-06

50-446/81-06

cc w/ enclosure

Texas Utilities Generating Company

ATTN: Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas 75201

,

{

{

.

.

$

I

..

,.

.

.

..

.-

.-