ML20004D342

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-327/81-02 on 810119-23 & Notice of Violation
ML20004D342
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/18/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20004D334 List:
References
NUDOCS 8106090240
Download: ML20004D342 (2)


See also: IR 05000327/1981002

Text

r

-

.

.

f aus

8

UNITED STATES

8

NUCLE AR REGULATORY COMMISSION

o

$

E

REGION ll

8

101 MARIETTA ST., N.W.. SulTE 3100

Pk

ATLANTA, GEORGIA 30303

o

FEB 181981

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report No. 50-327/81-2

This refers to the routine safety inspection conducted by R. L. Fiedler of this

office on January 19-23, 1981, of activities authorized by NRC Operating License

No. DPR-77 for the Sequoyah facility. Our preliminary findings were discussed

with J. Ballentine at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinatiens of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Appendix A.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC Public Document Room.

If this report con-

tains any information that you believe to be proprietarj, it is necessary that

you make a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must include the basis

for claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

.

you in this regard within the specified period, the report will be placed in the

Public Document Room.

,

i

'

?

8AO,6090 N'

!

-

i

f

~.

.

.

3

.

Tennessee Valley Authority

2

FEB 181981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely

)b? l ~a

R. C. Le is, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-327/81-2

cc w/ encl:

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

1

.

V

(

e

.