ML20004D021
| ML20004D021 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/24/1981 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20004D022 | List: |
| References | |
| NUDOCS 8106080171 | |
| Download: ML20004D021 (2) | |
See also: IR 05000313/1981006
Text
rr
[I b
4
UNITED STATES
g
y
NUCLEAR REGULATORY COMMISSION
,, 7
[-
.
[
~
REGION IV
n
g
,8
611 RYAN PLAZA DRIVE. SulTE 1000
C
ARUNGTON. TEXAS 76011
@
' ./Ag/
"
,,,,,
In Reply Refer To:
April 24,1981
<
F. \\Oh $\\
Docket Nos. 50-313/81-06
J
IUJ h
50-368/81-05
%
JUN 0519815- 42
. a mu m "m
Arkansas Power and Light Company
p
ATTN: Mr. William Cavanaugh III
w
Senior Vice President, Energy Supply
Post Office Box 551
Little Rock, Arkansas
72203
Gentlemen:
This refers to the inspection conducted by Messrs. J. R. Bo'ardman, D. M. Hunnicutt
and J. D. Jaudon of our staff during the period of March 2-13, 1981, of activities
authorized by NRC Facility Operating Licenses Nos. OPR-51 and NPF-6 for the
Arkansas Nuclear One, Units 1 and 2, and to the discussion of the findings by
the inspectors with members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas,' the inspection consisted of
selective examination of procedures and representative records, interviews with
p?rsonnel, and observations by the inspectcrs.
During this inspection, it was found that certain of your activities were not
conducted in full compliance with NRC requirements.
Consequently, you are
required i respond to this matter, in writing, in accordance with the pro-
visions of Section 2.201 of the NRC's " Rules of Practice, Part 2, Title 10,
Code of Federal Regulations.
Your response should be based on the specifics
contained in tSe Notice of Violation enclosed with this letter.
In accordance with Se: tion 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Fe teral Regulations, a copy of this letter and the enclosed
inspection report will be placed ir. the NRC's Public Document Room.
If the
report contains any information tha; you believe to be proprietary, it is
necessary that you submit a written application to this office, within 25 days
of the date af this letter, requesting that such information be withheld from
public disc'.osure. The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be orepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be pined in the Public
Document Room.
8106080l]{
t
..>
- Arkansas Power ~and Light Company
2
. April 24,1981'
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
hbNQ
G. L. Madsen, Chief
Reactor Projects Branch
Enclosures:
1.
~ Appendix A, Notice of Violation
2.
IE Inspection Report No.
50-313/81-06; 50-368/81-05
cc w/ enclosures:
-Arkansas Nuclear Or.e
ATTN:
J. P. O'Hanlon, Manager
Post Office Box 608
Russellville, Arkansas 72801
l
.
E