Forwards IE Insp Repts 50-460/81-04 & 50-513/81-04 on 810413-16.No Noncompliance Noted
ML20004D011
Person / Time
Site: Washington Public Power Supply System
Issue date: 05/13/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20004D012 List:
References
NUDOCS 8106080155
Download: ML20004D011 (2)


See also: IR 05000460/1981004

Text

.

TIC-

  1. pa atouq'o

UNITED STATES

g

l'

NUCLEAR REGULATORY COMMISSION

n

6,

.E

REGION V

o, ;

-

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

o

  • ,,,*

WALNUT CR E E K, CALIFORNI A 94596

MAY 131981

.ocket No. 50-460, 50-513

5

O

fe,@@s

05'1934 F

Washington Public Power Supply System

V

  • D

b0 George ashington Way

Richicnd, Washington 99352

p

Attention: Mr. D. W. Mazur

os

'

Program Director, WNP-1/4

Gentlemen:

Subject: NRC Inspection of Washington Nuclear Projects 1 and_4

This refers to the inspection conducted by Messrs. J. O. Elin and A. D' Angelo

of this office on April 13-16, 1981 of activities authorized by NRC Construction

Permit Nos. CPPR-134 and CPPR-174, and to the discussion of our findings held by

Messrs. Elin and D' Angelo with you and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

l

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter a written application

!

l

to this office to withhold such information.

If your receipt of this letter

l

has been delayed such that less than seven (7) days are available for your

i

l

l

810 6 0 8 O lM

9

' Washington Public Power Supply System

-2-

MAY 131981

d

review, please notify this office promptly so that a new due date may

be established. Consistent with section 2.790(b)(1), any such application

must be accompanied by an affadavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in10CFR2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affadavit.

If

we do not hear from you in this regard within the specified periods noted

above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to disuss them with you.

Sincerely,

d7

B. H. Faulkenber '^N

Chief, Reactor onstruction rojects

Branch

Enclosure:

IE Inspection Report

Nos. 50-460/81-04

50-513/81-04

cc w/o enclosure:

R. B. Glasscock, Quality Assurance Director