ML20004C885

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-277/81-06 & 50-278/81-06 on 810225-26.No Noncompliance Noted
ML20004C885
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/15/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20004C886 List:
References
NUDOCS 8106080014
Download: ML20004C885 (2)


See also: IR 05000277/1981006

Text

%

!

[b

[g gge%g

UNITED STATES

  • ,., (

}

NUCLEAR REGULATORY COMMISSION

.

j *.k I.-

j

REGION I

g

631 PARK AVENUE

e

3

-

KING OF PRUSSI A. PENNSYt.V ANI A 19406

,

APR 151981

[

-#

Docket Nos. 50-277

pv

(pryjs

50-278

/7

OL'JLJI,L)-

-

s

2

JUll 0 31981 r_ 2

Philadelphia Electric Company

u.a, =,,, ,%*'

?

ATTN: Mr. S. L. Daltroff

sowu

g

Vice President

'S

Electric Production

9

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Report Nos. 50-277/81-CS,50-278/81-06

This refers to the special, safety inspection conducted by Mr. J. Roth of this

office on February 25-26, 1981 at your Peach Bottom Nuclear Power Plants, Units

2 and 3, Delta, Pennsylvania of activities authorized by NRC License Nos. DPR-44

and DPR-56 and to the discussions of our findings held by Mr. Roth with Mr. U!1 rich

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

'

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

l

accompanied by an affidavit executed by the owner of the information, which

.

identifies the document or part sought to be withheld, and which contains a

l

statement of reasons which addresses with specificity the items which will be

I

considered by the Comission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

i

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

,

.

810s "

L

.

.

Philadelphia Electric Co.

2

AW>R 151981

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

d C d%,3,. Ac

R. R. Keimig, Chie%b

f

Projects Branch #2, Division of

Resident and Project Inspection

Enclosure: Combined Office of Inspection and Enforcement Inspection

Report Number 50-277/81-06,50-278/81-06

cc w/ enc 1:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Michael J. Scibinico, II, Assistant Attorney General (Without Report)

.

_ _ - _