Deficiency Rept Re Repairs to Motor Control Ctrs.Extension of Completion Date to Aug 1981 Required for Repainting Cabinets
ML20004C795
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/29/1981
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-17(80), NUDOCS 8106050267
Download: ML20004C795 (1)


Text

_

d}

  • p o. sox sooo. cLEvELANo. oMio 44toi. TELEPHONE (216) 622-960o. ILLUMINATING BLCG.

E ss PUBUCsCUARE emn; De Ben Wah in me Nat,m Dalwyn R. Davidson ViCE PRES 1 CENT system ENGINEERING AND CcNsTRUCTioN May 29, 1981

4.,\\

e

9 Y

~

p% \\. -f. 9}

0

^g Mr. James G. Keppler p+

dp Director, Region III-Office of Inspection and Enforcement f

U. S. Nuclear Regulatory Commission sw 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Perry Nuclear Power Plant Docke t Nos. 50-440; 50-441 Repairs to Motor Control Centers (RDC 17(80))

As discussed with Mr. L. McGregor cf your office on May 28, 1981, the final repairs on the motor control centers sup-plied by Cutler-Hammer vill now be completed in August 1981.

We stated in our final report dated March 9, 1981, that these repairs would be completed by June 1,1981. While the cor-rective action discussed remains the same, repainting the cab-inets at the Cutler-Ha==er tacility has now been ordered and extension of the completion date is required for this additional work.

Very truly yours, ll;7 M)}

hfL o

Dalwyn.. Davidson Vice President System Enginering and Construction DRD: bas

\\

Mr. Jack Hughes, NRC Resident Inspector, PNPP hQ cc:

\\

Mr. Victor Stello, Director, Of fice of Inspection and Enforcement, USSRC, Washington, D.C. 2055!