- p o. sox sooo. cLEvELANo. oMio 44toi. TELEPHONE (216) 622-960o. ILLUMINATING BLCG.
E ss PUBUCsCUARE emn; De Ben Wah in me Nat,m Dalwyn R. Davidson ViCE PRES 1 CENT system ENGINEERING AND CcNsTRUCTioN May 29, 1981
- 4.,\\
e
- 9 Y
~
p% \\. -f. 9}
0
^g Mr. James G. Keppler p+
dp Director, Region III-Office of Inspection and Enforcement f
U. S. Nuclear Regulatory Commission sw 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
Perry Nuclear Power Plant Docke t Nos. 50-440; 50-441 Repairs to Motor Control Centers (RDC 17(80))
As discussed with Mr. L. McGregor cf your office on May 28, 1981, the final repairs on the motor control centers sup-plied by Cutler-Hammer vill now be completed in August 1981.
We stated in our final report dated March 9, 1981, that these repairs would be completed by June 1,1981. While the cor-rective action discussed remains the same, repainting the cab-inets at the Cutler-Ha==er tacility has now been ordered and extension of the completion date is required for this additional work.
Very truly yours, ll;7 M)}
hfL o
Dalwyn.. Davidson Vice President System Enginering and Construction DRD: bas
\\
Mr. Jack Hughes, NRC Resident Inspector, PNPP hQ cc:
\\
Mr. Victor Stello, Director, Of fice of Inspection and Enforcement, USSRC, Washington, D.C. 2055!