Text

r

3

m arou

UNITEE) STATES

g

f,,

NUCLEAR REGULATORY COMMISSION

(.

g

g

REGloN :::

j

=

' 799 ROOSEVELT ROAD

S

t,.....[

GLEN ELLYN. lLLINOIS Go137

April 29,1981

.

W

L? k

Docket No. 50-346

g

3

s

,

Toledo Edison Company

ij b,

D

~

ATTN:

Mr. Richard P. Crouse

ski

JUN 011981 > T

Vice President

n

,

{p\\u.s.mgcueg^t088

Nuclear

Edison Plaza

300 Madison Avenue

/

4

Toledo, OH 436P

ta

t*

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. L. A. Reyes

and W. G. hogers of this office on March 2-31, 1981, of activities at Davis-

Besse Nuclear Power Station, Unit 1, authorized by NRC Operating License No.

NPF-3 and to the discussion of our findings with Mr. T. Murray at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written respona.e, submitted under otth or affirmation, is required.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty-five days of the date of this letter, to withhold

such information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

8106040 0% 5

k~

,-.

..

.

i

o

Toledo Edison Company.

-2-

April 29, 1981

i

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

O

. F. Heishman, Acting Director

Division of Resident and Project

Inspection

Enclosures:

1.

Appendix A, Notice-

of Violation

-

2.

IE Inspection Report

No. 50-346/81-04

cc-w/encls:

T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

' '

NSIC

TIC

Harold W. Kohn, Power

,

Siting Commission

Helen W. Evans, State of Ohio

l

l