Text
r
3
m arou
UNITEE) STATES
g
f,,
NUCLEAR REGULATORY COMMISSION
(.
g
g
REGloN :::
- j
=
' 799 ROOSEVELT ROAD
S
t,.....[
GLEN ELLYN. lLLINOIS Go137
April 29,1981
.
W
L? k
Docket No. 50-346
g
3
s
,
Toledo Edison Company
ij b,
D
~
ATTN:
Mr. Richard P. Crouse
ski
JUN 011981 > T
Vice President
n
,
{p\\u.s.mgcueg^t088
Nuclear
Edison Plaza
300 Madison Avenue
/
4
Toledo, OH 436P
ta
t*
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. L. A. Reyes
and W. G. hogers of this office on March 2-31, 1981, of activities at Davis-
Besse Nuclear Power Station, Unit 1, authorized by NRC Operating License No.
NPF-3 and to the discussion of our findings with Mr. T. Murray at the con-
clusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written respona.e, submitted under otth or affirmation, is required.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty-five days of the date of this letter, to withhold
such information from public disclosure. The application must include a full
statement of the reasons for which the information is considered proprietary,
and should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
8106040 0% 5
k~
,-.
..
.
i
o
Toledo Edison Company.
-2-
April 29, 1981
i
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
O
. F. Heishman, Acting Director
Division of Resident and Project
Inspection
Enclosures:
1.
Appendix A, Notice-
of Violation
-
2.
IE Inspection Report
No. 50-346/81-04
cc-w/encls:
T. D. Murray, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local PDR
' '
Harold W. Kohn, Power
,
Siting Commission
Helen W. Evans, State of Ohio
l
l