ML20004C381
| ML20004C381 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Haddam Neck, 05000246 File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 05/26/1981 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| LSO5-81-05-042, LSO5-81-5-42, NUDOCS 8106030330 | |
| Download: ML20004C381 (3) | |
Text
_ _ _ _ _ - - -.
.6
. #yenig%
UNITED STATES
~ 1.
NUCLEAR REGULATORY COMMISSION g,.....)
WASHINGTON, D. C. 20885 g
.May 26, 1981
)
Docket No LS05-81-05-042
{ [U h
d.
. U e,
a Mr. William'G. Counsil, Vice President 2
JUN 0119814 l
Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company u,mjg,W m 0
cc Northeast Nuclear Energy Company
/f Post Office Box 270_
t Hartford, Connecticut 06101
Dear Mr. Counsil:
-The purpose of this letter is to confirm discussions held at Northeast Utilities' offices on April 29, 1981 concerning contingency planning for the Millstone and'Haddam Neck Nuclear Power Facilities. During these discussions,: members of the NRC staff indicated to members of your staff that the contingency plans for these facilities could not be approved because the plans do not contain some essential elements i
of the information required by Appendix C to 10 CFR Part 73.
l For a plan to be acceptable it must contain (1) a predetermined set of decisions and actions to satisfy stated objectives, (2) an identifica-tion of the data, criteria, procedures and mechanisms necessary to t
effect efficiently the decisions and actions, and (3) a specification of the individual, group or organizational entity for each decision and action.
It was pointed out that the two general groupings proposed in the Responsibility Matrix, namely " Security Force" and " Operating Staff", did not provide us with sufficient information to determine that the safeguards responsibilities are assigned in a manner that precludes conflict in duties or responsibilities that would prevent the execution of the plan in any safeguards contingency.
It was also pointed out that this assignment of responsibility requirement could be demonstrated if the current submissions were mcdified as we have suggested in recent telephone conversations.
It appears that the i
necessary planning may have been performed since many of the appropriate tasks and decisions are reflected in the responsibility matrix. However, the identification of individuals (by title) groups or organizational entities within the two general groups which will actually be called upon to perform the tasks and make the decisions, would allow us to l
I determine whether there are conflicts in duties which would prevent the effective execution of the plan.
l I
i i
'i I
I 810603 0 Boo l
Y-
W.G. Counsil May 26, 1981 The enclosure to this letter lists some of the actions for which failure to' identify a specific responsible individual by title could result in a conflict of duties. This is an illustrative list and is not intended to be all inclusive.
We request.that you respond to this letter within 30 days of your receipt.
Please note that the enclosure to this letter is being withheld from public disclosure in accordance with 10 CFR 2.790(d).
Sincerely, Dennis rutch eld, ief Operating Reactors Branch #5 Division of Licensing
Enclosure:
As stated cc w/o enclosure:
See next page s
- )
e t
l
?
- hr. W.' G. Counsil May 26, 1981.
cc w/oLenclosure:
William H. Cuddy, Esquire Connecticut Energy Agency Day, Berry & Howard ATTN: Assistant Director Counselors ~ at Lew.
Research and Policy One Constitution Plaza Development Hartford, Connecticut 06103 Department of Planning and Energy Policy Board of Selectmen 20 Grand Street Town Hall Hartford, Connecticut 06106 Haddam, Connecticut 06103 U. S. Environmental Protection Agency Northeast Nuclear Energy Company Region 1 Offica ATTN: Superintendent ATTN: EIS C00RDINATOR Millstone Plant JFK Federal Suilding P. O. Box 128 Boston, Massachusetts 02203 Waterford, Connecticut 06385 Superintendent Mr. Janes R. Himmelwright Haddam Neck Plant i
2 Northeast Utilities Service Conpany RFD #1 P. O. Box 270 Post Office Box.127E Hartford, Connecticut 06101 East Haapton, Connecticut 06424 Resident Inspector Resident Inspector
.c/o U. S. NRC Haddam Neck Nuclear Power Station P. O. Box Drawer KK c/o U. S. NRC i
Niantic, Connecticut 06357 East Haddam Post Office East Haddam, Connecticut 06423 Waterford Public Library i
Rope Ferry Road, Route 156 Waterford, Connecticut 06385 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road l
Waterford, Connecticut 06385 John F. Opeka Systens Superintendent Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Natural Resources Defense Council i
91715th St.eet, N. W.