Forwards IE Insp Rept 50-483/81-09,on 810401-30.No Noncompliance Noted
ML20004C222
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/15/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML20004C223 List:
References
NUDOCS 8106020339
Download: ML20004C222 (2)


See also: IR 05000483/1981009

Text

.

o

UNITED STATES

g

g

_

!

NUCLEAR REGULATORY COMMISSION

'

.r,

o

$

,E

REGION lli

O

3

%, .... j/

7se noosEVELT ROAD

  • /

g

,

'(

GLEN ELLYN, ILLINOIS 80137

g

'

.

p

u

i

16

M

Ol

O

""

~

May 15, 1981

f

Docket No. 50-483

'f

Union Electric Company

Y,

N

ATTN:

Mr. John Bryan

Vice President - Nuclear

P. O. Box 149

St. Louis, MO 63166

Gentismen:

This refers to the routine safety inspection conducted by Mr. W. A. Hansen

of this office on April 1-30, 1981, of activities at the Callaway Plant,

Unit 1, authorized by NRC Construction Permit No. CPPR-139 and to the

discussion of our findings with M. . Weber r.nd others of the Callaway

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

l

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

i

l

days from the date of this letter of your intention to file a request for

.

withholding; and (b) submit within twenty-five (25) days from the date of

l

this letter a written application to this office to withhold such infor-

'

mation. Section 2.790(b)(1) requires that any such application must be

l

accompanied by an affidavit executed by the owner of the information which

I

identifies the document or part sought to be withheld, and which contains

i

a full statement of the reasons on the basis which it is claimed that the

l

information should be withheld from public disclosure. This sectier further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavf.t.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

,

,

,

'

,

I

<

8106020

.

. .

.

2-

May 15, 1981

Union Electric Company

-

We will gladly discuss any questions you have-concerning this

inspection.

Sincerely,

R. f Heishman, Acting Director

Division of Resident and

!

~ ~

Project Inspection

-

4

Enclosures:

IE Inspection

-

Report No. 50-483/81-09

cc w/ encl:

W.

H. Weber, Manager

Nuclear Construction

-

'

Central Files

Reproduction Unit NRC 20b

PDR

-

Local PDR

NSIC

TIC

Regions I C IV

K. Drey

Ronald Fluegge, Utility

Division, Missouri Public

Service Commission

i

RI EI

RIII

RIII

RIII

Fiorell$

H&eshman

d Il

e

onx in

    • "-

'

.

- - - . ,

~

n-

e.n,w

g,

.

m-

,g

-,..,,n

e

.a

w

.- ,,

ww,-

- - - - .

--

4

-,w,,-,

, , ,

y+w,

w

,sm,~