ML20004C222
| ML20004C222 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/15/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML20004C223 | List: |
| References | |
| NUDOCS 8106020339 | |
| Download: ML20004C222 (2) | |
See also: IR 05000483/1981009
Text
.
o
UNITED STATES
g
g
_
!
NUCLEAR REGULATORY COMMISSION
'
.r,
o
$
,E
REGION lli
O
3
%, .... j/
7se noosEVELT ROAD
- /
g
,
'(
GLEN ELLYN, ILLINOIS 80137
g
'
.
p
u
i
16
M
Ol
O
""
~
May 15, 1981
f
Docket No. 50-483
'f
Union Electric Company
Y,
N
ATTN:
Mr. John Bryan
Vice President - Nuclear
P. O. Box 149
St. Louis, MO 63166
Gentismen:
This refers to the routine safety inspection conducted by Mr. W. A. Hansen
of this office on April 1-30, 1981, of activities at the Callaway Plant,
Unit 1, authorized by NRC Construction Permit No. CPPR-139 and to the
discussion of our findings with M. . Weber r.nd others of the Callaway
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
l
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
l
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
i
l
days from the date of this letter of your intention to file a request for
.
withholding; and (b) submit within twenty-five (25) days from the date of
l
this letter a written application to this office to withhold such infor-
'
mation. Section 2.790(b)(1) requires that any such application must be
l
accompanied by an affidavit executed by the owner of the information which
I
identifies the document or part sought to be withheld, and which contains
i
a full statement of the reasons on the basis which it is claimed that the
l
information should be withheld from public disclosure. This sectier further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavf.t.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Room.
,
,
,
'
,
I
<
8106020
.
. .
.
2-
May 15, 1981
Union Electric Company
-
We will gladly discuss any questions you have-concerning this
inspection.
Sincerely,
R. f Heishman, Acting Director
Division of Resident and
!
~ ~
Project Inspection
-
4
Enclosures:
IE Inspection
-
Report No. 50-483/81-09
cc w/ encl:
W.
H. Weber, Manager
Nuclear Construction
-
'
Central Files
Reproduction Unit NRC 20b
-
Local PDR
Regions I C IV
K. Drey
Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
i
RI EI
RIII
RIII
RIII
Fiorell$
H&eshman
d Il
e
onx in
- "-
'
.
- - - . ,
~
n-
e.n,w
g,
.
m-
,g
-,..,,n
e
.a
w
.- ,,
ww,-
- - - - .
--
4
-,w,,-,
, , ,
y+w,
w
,sm,~