Text
.
i ILLUMINATING BLDG. e PU8UC SQUARE e CLEVELAND. CHIO 44101 e TELEPHONE (216) 6231350 e MAIL ADDRESS: P. O. 80X 5000 Serving Tne Best Location in the Nation Dalwyn R. Davidson
- ~---,
D vtCC PRES: CENT M ' / # ' *+
SrSTEM ENGlNEEPtNG AND CONSTRUCT'ON
' / _rp os
-f 3
- s. C
,o,' j. ;(/
- %]4,,1; & Q May 26, 1981 AN 0 J, Lect, f
~
l Mr. Robert L. Iedesco
- [
+l W,s. meuAn nm, q rs eco nse
,p Assistant Director of Licensing Division of Licensing
,A (Q';;
United States Nttelear Regulatory Commission
'4ashington, D.C.
20555
Dear Mr. Tedesco:
Your letter dated March 24, 1981, concerning Control Roon Design Review, requested an estimate cf when the Ferry Control Roc = will be ready for a
- iRC site visit.
'de have reviewed your criteria for determining whether a plant is ready for :CCL OFIR and submit our evaluation for when the site review vill be feasible.
The following criteria refer to those identified in your " Criteria for Determining 'dhether a Plant is Ready for our Ff0L CFIR".
Date Cc=pleted Criteria at Ferry 1
10/82 2
10'/82 3
1/32 h
10/52 5
1/52 6
10/82 7
2/83+
3 6/S1 9
10/e2 10 iia 11 10/31 12 6/81 13 10/e2 14 10/31 15 10/81
- Dcpected :iRC operators license issuance date. Operators will be trained toperformCFIRtasksby10/32.
' doc /
s
//o
'8106 o u 03lb k
~
Mr. Robert L. Tedesco Page.2 The above dates are base.d on a conservative reading of your criteria.
Some changes may be possible if this schedule does not meet your requirements.
Sincerely yours,
.f Dal-[ R. Davidson Vice President'
. System Engineering
. and Constraction.
- DRD: dip cc: