pa rttg,,
,8 e
UNITED STATES y
)
g NUCLEAR REGULATORY COMMISSION E
WASHINGTON, D. C. 20555
$.g y
}
May 21, 1981 Docket Nos. 50-266 9
and 50-301 4
T3 sb gSF h Mr. Sol Burstein
$ Sid g# " '
!6 p jmd 6
p Executive Vice President Wisconsin Electric Power Company s
231 West Michigan Street Milwaukee, Wisconsin 53201 a;i
SUBJECT:
ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT RE: POINT BEACH HUCLEAR PLANT, UNIT NOS. 1 AND 2, LICENSE NOS. DPR-24 AND DPR-27 Reference (a) - Order for Modification of License Concerning the Environmental Qualification of Safety-Related Electrical Equipment dated October 24, 1980.
Dear Mr. Burstein:
This letter transmits the Safety Evaluation for the Environmental Qualification of Safety-Related Electrical Equipment at your facilities. This evaluation was based on your submittals dated April 18, Septenber 30 and October 30, 1980.
Our letter of March 27, 1981, which forwarded our preliminary results, indicated that an item-by-item re-evaluation would be required at a later date. This safety evaluation identifies the specific information required by the staff and the actions, on your part, necessary to comply with Reference (a). We request that you provide the information identified in sections 3 and 4 of this Safety Evaluation to us within 90 days.
This safety evaluation addresses only the safety-related electrical equipment exposed to a harsh environment resulting from an accident (i.e., the IEB 79-01B review). Reference (a) requires that all safety-related electrical equipment be qualified by June 30, 1982. The NRC review effort for the equipment in mild environments will be addressed by separate correspondence.
Your response may present alternatives to the staff positions in the evaluation.
The staff will consider alternative approaches if these methods are within the D0R Guidelines or NUREG-0588, as appropriate. For example, an acceptable alternative to the NRC staff's temperature criterion used for the service conditions (i.e. Section 3.3) must base that service condition on the FSAR analysis or other NRC approved analysis, provided that the specific analysis, together with reference to the previous NRC acceptance of that analysis, accompanies the 90 day response. In addition, some of the information in the Safety Evaluation may require clarification. Contact your project manager for assistance in these matters.
8106 010Q$
1
~
p It remains your responsibility to assure that the qual'ification deadline is met for all safety-related electrical equipment. The staff's review of your response to this letter should not delay any action which is required in order to meet the deadline.
Sincerely, w
Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
Enclosures:
1.
SER 2.
TER cc w/ enclosures:
See next page I
~
c Wisconsin Electric Power Coapany cc:
Mr. Bruce Churchill, Esquire Mr. William Guldemond Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office
, 1800 M Street, N. W.
6612 Nuclear Road Washington, D. C.
20036 Two Rivers, Wisconsin 54241 Joseph Mann Library 1516 Sixteenth Street Two Rivers, Wisconsin 54241 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Cocpany Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisco' sin 54241 Ms. Kathleen M. Falk General Counsel Wisconsin's Environmental Decade 302 E. Washington Avenue Madison, Wisconsin 53703 Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)
U.S. Environmental Protection Agency Washington, D. C.
20460 U. S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN:
EIS COORDINATOR 230 S. Dearborn Street Ch'icago, Illinois 60604 Chai rman Public Service Commission of Wisconsin Hills Farns State Office Building Madison, Wisconsin 53702 s
1
.