e
=
^
- l
%
UNITED STATES
NUCLEAR REGULATORY COMMISSION
f.,,
gj
REGloN IV
~,
- /
611 RYAN Pt.AZA ORIVE, SulTE 1000
?,{?
,.
ARUNGToN. TEXAS 78011
,
,,
May 15, 1981
In Reply Refer To:
Docket 50-285/81-07
Omaha Public Power District
ATTN: Mr. W. C. Jones, Division Manager
Production Operations
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs. J. R. Boardman and
D. M. Hunnicutt of this office during the period of March 23-27,1981, of
activities authorized by NRC Operating License CPR-40 for the Fort Calhoun
Station, and to the discussion of the findings with Mr. R. L. Andrews and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclo, sed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the int
tors.
During this inspection it was found that certain of your activities were
not conducted in full compliance with NRC requirements. Consequently, you
are required to respond to this matter, in writing, in accordance with the
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations. Your response should be based on
the specifics contained in the Notice of Violation enclosed with this letter.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within 10 days from the date of
this letter of your intention to file a request for withholding; and (b) sub-
mit within 25 days from the date of this letter a written application to this
office to withhold such information.
If your receipt of this letter has been
delayed such that less than seven days are available for your review, please
notify this office promotly so that a new due date may be established.
Consistent with Section 2.790(b)(1), any such application must be accompanied
!
by an affidavit executed by the owner of the information which identifies the
l
document or part sought to be withneld, and which contains a full statement of
the reasons on the basis which it is claimed that the information should be
withheld from public disclosure. This section further requires the statement
to address with specificity the considerations listed in 10 CFR
\\
l
,
\\
i
l
I
!
!8106010 %
9
-
.
_ . _ .
_
.
.
-
.-
-.
-
- . - -
-
-
-
.
..
. _ _ ..
!
.
.
A
Omaha Public Power District
2
May 15, 1981
The information sought to be withheld shall be incorporated as far a:: possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
bhh
l
G. L. Madsen, Chief
j
Reactor Projects Branch
la
Enclosures :
1.
Appendix A, Notice of Violation
2.
IE Inspection Report 50-285/81-07
cc w/ enclosures:
S. C. Stevens, Manager
.
Fort Calhoun Station
P. O. Box 98
Fort Calhoun, Nebraska 68023