| Site: | Cooper |
| Issue date: | 05/14/1981 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20004C060 | List: |
| References | |
| NUDOCS 8106010472 | |
| Download: ML20004C059 (2) | |
See also: IR 05000298/1981006
Text
.
-
j
<.
jf** N,
UNITED STATES
'*
[.
'
NUCLEAR REGULATORY COMMISSION
h:
REGloN sv
%,,,*//
$L_
i
611 RYAN PLAZA DRIVE. SUITE 1000
,,#
ARUNGToN. TEXAS 70011
May 14, 1981
In Reply Refer To:
'
Docket: 50-298/81-06
Nebraska Public Power District
ATTN: Mr.
M. Pilant, Director
Licensing and Quality Assurance
Post Office Box 499
Coluntus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by Mr. J. R. Boardman of this office
during the period April 13-16, 1981, of activities authorized by NRC Facility
Operating License DPR-46, for the Cooper Nuclear Station and to the discussion
of our findings with Messrs. R. S. Kamber, R. E. Buntain, L. C. Lessor, and
members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection condsted of
selective examis cion of procedures and representative records, interviews with
personnel, and observations by the inspector.
.
During this inspection it was found that certain of your activities were not
conducted in full compliance with NRC requirements. Consequently, you are
required to respond to this matter, in writing, in accordance with the pro-
visions of Section 2.201 of the NRC's " Rules of Practice," Par? 2, Title 10,
Code of Federal Regulations. Your response should be based on J.he specifics
contained in the Notice of Violation enclosed with this letter.
In accordance with 10 CFR 2.790 of the Coninission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within 10 days from the date of
this letter of your intention to file a request for withholding; and (b) sub-
mit within 25 days from the date of this letter a written application to this
office to withhold such information.
If your receipt of this letter has been
delayed, such that less than seven days are available for your review, please
notify this office promptly so that a new due date may be established.
Consistent with Section 2.790(b)(1), any such application must be accompanied
by an affidavit.oxecuted by the owner of the information which identifies the
document or part sought to be withheld, and which contains a full statement
of the reasons on the basis which it is claimed that the information should be
- &
8106010 M }
-
h
.
.
.
.
.
.
.
..
.
_-
,
. _ . .
.
Nebraska Public Power District
2
t'ay 14,1981
withheld from public disclosure. This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
'
to discuss them with you.
Sincerely,
k
W.C.SeidTe, Chief
Engineering Inspection Branch
Enclosure:
IE Inspection Report 50-298/81-06
cc: w/ enclosure
L. C. Lessor, Superintendent
Cooper Nuclear Station
Post Office Box 98
-
Brownville, Nebraska 58321