Forwards IE Insp Rept 50-382/81-10 on 810407-16.No Noncompliance Noted
ML20004B103
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/13/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Aswell D
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20004B104 List:
References
NUDOCS 8105270244
Download: ML20004B103 (2)


See also: IR 05000382/1981010

Text

,

,

/[

"

4

UNITED STATES

1

NUCLEAR REGULATORY COMMISSION

. . .

.,

!

'M) El

4

REGloN IV

i

5 -/

611 RYAN PLAZA DRIVE. SUITE 1000

.

h

ARUNGToN. TEXAS 76011

/

g

,,

May 13, 1981

9

g

In Reply Refer To:

($

v[

'

,

RIV

\\

  1. ,,U.q[

Docket 50-382/Rpt. 81-10

N/ lic

Louisiana Power and Light Company

ATTN: Mr. D. L. Aswell

Vice President Power Production

142 Delaronde Street

New Orleans, Louisiana

70174-

Gentlemen:

This refers to the inspection onducted by Mr. R. C. Stewart of our staff during

the period April 7-16, 1981, of. activities authorized by NRC Construction Pemit

CPPR-103 for Waterford Steam Electric Station, Unit 3, and to the discussion of

/

our findings with Mr. L. L. Bass and other members of your staff at the conclusion

\\

of the inspection.

Areas examined during the inspection and our findings are discussed in the

-

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviations were identified.

In accordance witn 10 CFR 2.790 of the Connission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any infomation that you (or

tractors) believe to be exempt from disclosure under 10 CFR 9.5(.a)(4)your con-

, it is

necessary that you (a) notify this office by telephone within 10 days from the

date of this letter of your intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter a written application to

this office to withhold such infomation.

If your receipt of this letter has

been delayed such that less than seven days are available for your review,

please notify this office promptly so that a new date may be established. Con-

sistent with Section 2.790(b)(1), any such application must be accompanied by

an affidavit executed by the owner of the infomation which identifies the

document or part sought to be withheld, and which contains a full statement of

the reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The infomation sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, the report will be placed in

the Public Document Room.

o\\

$t

!saos n % -

- - - - .

-

-.

. -

.

-

-

-

--

.

.

Louisiana Power and Light Company

2

May 13, 1981

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

h!

=EeW

G. L. Madsen, Chief

Reactor Projects Branch

Enclosure:

IE Inspection Report No. 50-382/81-10

-

.