ML20004A975

From kanterella
Jump to navigation Jump to search
Forwards Revision 1 to Security Training & Qualification Plan.Revision 1 Withheld (Ref 10CFR2.790)
ML20004A975
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/26/1981
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NO-81-867, NUDOCS 8105270063
Download: ML20004A975 (1)


Text

_

S

w. m

)a

...2

. m n.c

. r: ::-- -

FILE: NO-001 (B)

SERIAL: NO-81-367 Eit. tamas A. Ippolito, Chief

.. /

' 's Cparating Reactors Branch No. 2 N. />[h' / ',f) g

,,,i Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission t

U b, Washington, D.C.

20555 E-i

u. A ' O 6 /Sg7 A,,,,

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 1

'# c$s%

DOCKET NOS. 50-325 AND 50-324 g

LICENSE NOS. DPR-71 AND DPR-62 xI M

SECURITY TRAINING AC QUALIFICATION PLAN

Dear Mr. Ippolito:

Your letter of March 18, 1981, requested additional informatica concerning the Security Training and Qualification Plan for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2.

In response to this request, five (5) copies of Revision 1 to the Brunswick Security Training and Qualification Plan are provided as the attached.

Revision 1 of the Security Training and Qualification Plan contains detailed sectartty measures for the physical protection of the Brunswick Plant.

This document is submitted to NRC under the provisions of Section 2.790(d) of ICCFR Part 2.

We therefore request that.his information be withheld from public disclosure in accordance with 10CFR 9.5 (a)(4).

Please contact us should you have any questions regarding this information.

Yours very trul1,

/

.w f

M8<9 E. E. Utley Executive Vice President Power Supply and Engineering & Construction JBW:kbb*

SCO/

Attachments s

/ 5 g

r 2 3.:...e 3.m 8I052700(33

~

.