Forwards 165 Revised Oversize P&Ids to Be Incorporated Into Fsar.Aperture Cards Are Available in PDR
ML20004A727
Person / Time
Site: Midland
Issue date: 04/30/1981
From:
BECHTEL GROUP, INC.
To:
NRC
Shared Package
ML20004A728 List:
References
NUDOCS 8105210199
Download: ML20004A727 (16)


Text

.' 9.

Bechtel Associates ProfessionalCorporation 777 East Eisenhower Parkway Ann Aroor, Micnigan Med Aggress P.O. Box 1000. Ann Arbor, Michigan 48106 Y

5*e 3P April 30, 1981

,g W

h fo Whom It May Concern:

i

' -.N 0.

r-7

)

7.nclosed is a revision to your set (s) of the Piping y d 8

Instrumentation Diagrams.

k t

Please recove the old diagrams and replace with these new ones.

If you have any questions, feel free to call L. Eultquist or D. Allred at (313)994-7861.

Thank you, 8

tfs\\ 6 'o

\\

8 f

M{B)p W

h 's/

Y 8105210 $ i

i 6

MIDLAND 1&2-FSAR SUPPLEMENTAL REFERENCE DRAWINGS Piping and Instrumentation Diagrams These drawings are in accordance with Midland's FSAR Revision 25.

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-400 Sh 1 1.1-1 Piping and Instrumentation Diagram 3

Legend M-400 Sh 2 1.1-2 Piping and Instrumentation Diagram 4

Legend M-400 Sh 3 1.1-3 Piping and Instrumentation Diagram 4

Legend M-401A 5.1-1 Reactor Coolant and Pressure 2

Sh 1 Control - Unit 1 M-401B 5.1-1 Reactor Coolant and Pressure 2

Sh 2 Control - Unit 1 M-402A 5.1-2 Reactor Coolant and Pressure 2

Sh 1 Control - Unit 2 M-402B 5.1-2 Reactor Coolant and Pressure 2

Sh 2 Control - Unit 2 M-403 Sh 1A 9.3-31 Makeup and Purification - Unit 1 4

Sh 1 M-403 Sh 1B 9.3-31 Makeup and Purification - Unit 2 3

Sh 2 M-403 sh 2A 9.3-32 Makeup and Purification - Unit 1 3

Sh 1 l

M-403 Sh 2B 9.3-32 Makeup and Purification - Unit 1 3

Sh 2 M-404 Sh 1A 9.3-33 Makeup and Purification - Unit 2 4

Sh 1 l

M-404 Sh 1B 9.3-33 Makeup and Purification - Unit 2 3

Sh 2 M-404 Sh 2A 9.3-34 Makeup and Purification - Unit 2 3

Sh 1 M-404 Sh 23 9.3-34 Makeup and Purification - Unit 2 2

Sh 2 1

Revision 33 4/81

MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-405 Sh A 9.3-40 Reactor Coolant Addition - Units 1 & 2 2

Sh 1 M-405 Sh B 9.3-40 Reactor Coolant Eddition - Units 1 & 2 2

Sh 2 M-405 Sh C 9.2-40 Reactor Coolant Addition - Units 1 & 2 1

Sh 3 M-406 Sh 1 9.3-3 Reactor Plant Sample System 5

M-406 Sh 2 9.3-4 Reactor Plant Sample System 5

M-406 Sh 3 9.3-5 Reactor Plant Sample System 5

M-406 Sh 4 9.3-6 Reactor Plant Sample System 5

M-407 Sh 1A 11.2-1 Liquid Waste - Units 1 & 2 1

Sh 1 M-407 Sh 1B 11.2-1 Liquid Waste - Units 1 & 2 2

Sh 2 M-407 Sh 2A 11.2-2 Liquid Waste - Units 1 & 2 1

Sh 1 M-407 Sh 2B 11.2-2 Liquid Waste - Units 1 & 2 1

Sh 2 M-407 Sh 3A 11.2-3 Liquid Waste - Units 1 & 2 1

Sh 1 M-407 Sh 3B 11.2-3 Liquid Waste - Units 1 & 2 1

Sh 2 M-407 Sh 4A 11.2-3A, Radwaste Pump Seal Water 0

Sh 1 System - Units 1 & 2 M-407 Sh 4B 11.2-3A, Radwaste Pump Seal Water 0

Sh 2 System - Units 1 & 2 M-408 Sh 1 9.3-35 Boron Recovery - Units 1 & 2 10 M-408 Sh 2A 9.3-36 Boron Recovery - Units 1 & 2 1

Sh 1 2

Revision 33 4/81

MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-408 Sh 2B 9.3-36 Boron Recovery - Units 1 & 2 1

Sh 2 M-408 Sh 3A 9.3-37 Boron Recovery - Units 1 & 2 1

Sh 1 M-408 Sh 3B 9.3-37 Boron Recovery - Units 1 & 2 1

Sh 2 M-408 Sh 4A 9.3-38 Boron Recovery - Units 1 & 2 2

Sh 1 M-408 Sh 4B 9.3-38 Boron Recovery - Units 1 & 2 2

Sh 2 M-408 Sh 5 9.3-18 Boron Recovery - Units 1 & 2 Riser 7

Diagram M-408 Sh 6 9.3-19 Boron Recovery - Units 1 & 2 Riser 7

Diagram M-409A 11.2-3 Radwaste Gas - Units 1 & 2 3

Sh 1 M-409B 11.3-2 Radwaste Gas - Units 1 & 2 3

Sh 2 M-410 5.4-10 Decay Heat Removal and Core 12 l

Flooding - Unit 1 l

l M-411 5.4-11 Decay Heat Removal and Core 12 Flooding - Unit 2 l

l M-112 Sh A 6.2-51 Reactor Building Spray - Unit 1 3

l Sh 1 l

l M-412 Sh B 6.2-51 Reactor Building Spray - Unit 1 4

Sh 2 l

l M-413 Sh A 6.2-52 Reactor Building Spray - Unit 2 2

l Sh 1 1

M-413 Sh B 6.2-52 Reactor Building Spray - Unit 2 3

Sh 2 i

3 Revision 33 4/81 i

l n

a---

-,--.,m

-,-r

+

4 s

MIDLAND 1&2-FSAR liping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-414 Sh A 9.1-1 Fuel Pool Cooling and Purification 2

Sh 1 M-414 Sh B 9.1-1 Fuel Pool Cooling and Purification 1

Sh 2 M-416 Sh 1A 9.2-7 Component Cooling Water - Unit 1 3

Sh 1 M-416 Sh 1B 9.2-7 Component Cooling Water - Unit 1 3

Sh 2 M-416 Sh 2A 9.2-8 Component Cooling Water - Unit 1 2

Sh 1 M-416 Sh 2B 9.2-8 Component Cooling Water - Unit 1 2

Sh 2 M-417 Sh 1A 9.2-9 Component Cooling Water - Unit 2 3

Sh 1 M-417 Sh 1B 9.2-9 Component Cooling Water - Unit 2 3

Sh 2 M-417 Sh 2A 9.2-10 Component Cooling Water - Unit 2 2

Sh 1 M-417 Sh 2B 9.2-10 Component Cooling Water - Unit 2 2

Sh 2 M-418 Sh A 9.2-2 Service Water Cooling Tower and Pump

.2 Sh 1 Structures - Units 1 & 2 M-418 Sh B 9.2-2 Service Water Cooling Tower and Pump 1

Sh 2 Structures - Units 1 & 2 M-419 Sh A 9.2-3 Service Nater Reactor and Auxiliary 2

Sh 1 Building - Units 1 & 2 M-419 sh B 9.2-3 Service Water Reactor and Auxiliary 2

Sh 2 Building - Units 1 & 2 M-420 Sh 1A 9.2-4 Service Water Turbine 2

Sh 1 Building - Units 1 & 2 M-420 sh 1B 9.2-4 Service Water Turbine 2

Sh 2 Building - Units 1 & 2 4

Revision 33 4/81

MIDLAND 1.2-FSAR' Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig "Jo.

FSAR Figure Title Rev M-420 Sh 2 9.2-5 Service Water Turbine 8

Building - Units 1 & 2 M-421 Sh 1 6.8-3 Reactor Building Penetration 3

Pressurization - Unit 1 M-421 Sh 2 6.8-4 Reactor Building Penetration 2

Pressurization - Unit 1 M-421 Sh 3 6.8-5 Reactor Building Penetration 2

Pressurization - Unit 1 M-422 Sh 1 6.8-6 Reactor Building Penetration 3

Pressurization - Unit 2 M-422 Sh 2 6.8-7 Reactor Building Penetration 2

Pressurization - Unit 2 M-422 Sh 3 6.8-8 Reactor Building Penetration 2

Pressurization - Unit 2 M-423 3.9-4 CCW and CRDM Interface - Unit 1 7

M-425 Sh 1 11.4-1 Solid Waste System 5

M-425 Sh 2 11.4-2 Solid Waste System 3

Sh 1 M-425 Sh 3 11.4-2 Solid Waste System 1

Fh 2 M-425 Sh 4 11.4-2 Solid Waste System 2

Sh 3 l

M-425 Sh 5 11.4-2 Solid Waste System 2

Sh 4 l

M-426 9.3-39 Boric Acid Evaporator 5

M-427 11.2-4 Liquid Waste Evaporator 5

l M-428 Sh A 9.2-11 Makeup Demineralizer 2

Sh 1 M-428 Sh B 9.2-11 Makeup Demineralizer 2

Sh 2 5

Revision 33 4/81 l

l L

MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-428 Sh C 9.2-11 Makeup Demineralizer 2

Sh 3 M-429 Sh 1 9.3-15 Evaporator Plant Sample System 2

M-429 Sh 2 9.3-16 Evaporator Plant Sample System 2

M-429 Sh 3 9.3-17 Evaporator Plant Sample System 3

M-429 Sh 4 9.3-17A Evaporator Plant Sample System 2

M-430 Sh 1A 10.4-26 Auxiliary Steam Boiler System 2

Sh 1 M-430 Sh 1B 10.4-26 Auxiliary Steam Boiler System 2

Sh 2 M-430 Sh 2 10.4-27 Auxiliary Steam Boiler System 2

M-430 Sh 3A 10.4-28 Auxiliary Steam Boiler System 1

Sh 1 M-430 Sh 3B 10-4-28 Auxiliary Steam Boiler System 1

Sh 2 M-431 Sh 1A 10.3-1 Main Steam Supply System - Unit 1 1

Sh 1 M-431 Sh 1B 10.3-1 Main Steam Supply System - Unit 1 0

Sh 2 M-431 Sh 2A 10.3-2 Main Steam Supply System - Unit 1 0

Sh 1 M-431 Sh 2B 10.3-2 Main Steam Supply System - Unit 1 0

Sh 2 M-432 Sh 1A 10.3-3 Main Steam Supply System - Unit 2 1

Sh 1 M-432 Sh IB 10.3-3 Main Steam Supply System - Unit 2 2

Sh 2 M-432 Sh 2A 10.3-4 Main Steam Supply System - Unit 2 1

Sh 1 6

Revision 33 4/81 3

, - -, - +

MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-432 Sh 2B 10.3-4 Main Steam Supply System - Unit 2 1

Sh 2 M-433A 10.4-1 Auxiliary Steam System - Unit 1 1

Sh 1 M-433B 10.4-1 Auxiliary Steam System - Unit 1 1

Sh 2 M-434A 10.4-2 Auxiliary Steam System - Unit 2 2

Sh 1 M-434B 10.4-2 Auxiliary Steam System - Unit 2 2

Sh 2 M-436 Sh 1A 10.2-1 Turbine Extraction, Heater Vents and 2

Sh 1 Drains - Unit 1 M-436 Sh IB 10.2-1 Turbine Extraction, Heater Vents and 2

Sh 2 Drains - Unit 1 M-436 Sh 2A 10.2-2 Turbine Extraction, Heater Vents and 1

Sh 1 Drains - Unit 1 M-436 Sh 2B 10.2-2 Turbine Extraction, Heater Vents and 1

Sh 2 Drains - Unit 1 M-437 Sh 1A 10.2-3 Turbine Extraction, Heater Vents and 3

Sh 1 Dra'.ns - Unit 2 M-437 Sh 1B 10.2-3 Tu::bine Extraction, Heater Vents and 3

Sh 2 Dr. tins - Unit 2 M-437 Sh 2A 10.2-4 Turbine Extraction, Heater Vents and 2

Sh 1 Drains - Unit 2 M-437 Sh 2B 10.2-4 Turbine Extraction, Heater Vents and 2

Sh 2 Drains - Unit 2 M-438 Sh 1A 10.4-8 Condensate and Feedwater System 3

Sh 1

- Unit 1 M-438 Sh 1B 10.4-8 Condensate and Feedwater System 2

Sh 2

- Unit 1 M-438 Sh 2A 10.4-9 Condensate and Feedwater System 2

Sh 1

- Unit 1 7

Revision 33 4/81

MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-438 Sh 2B 10.4-9 Condensate and Feedwater System 1

Sh 2

- Unit 1 M-438 Sh 3A 10.4-10 Condensate and Feedwater Systcm 4

Sh 1

- Unit 1 M-438 Sh 3B 10.4-10 Conden3 ate and Feedwater System 5

Sh 2

- Unit 1 M-438 Sh 4 10.4-10 Condensate and Feedwater System 2

Sh 3

- Unit 1 M-439 Sh 1A 10.4-11 Condensate and Feedwater System 4

Sh 1

- Unit 2 M-439 Sh 1B 10.4-11 Condensate and Feedwater System 2

Sh 2

- Unit 2 M-439 Sh 2A 10.4-12 Condensate and Feedwat System 3

Sh 1

- Unit 2 M-439 Sh 2B 10.4-12 Condensate and Feedwater System 1

Sh 2

- Unit 2 M-439 Sh 3A 10.4-13 Condensate and Feedwater System 4

Sh 1

- Unit 2 M-439 Sh 3B 10.4-13 Condensate and Feedwater System 5

Sh 2

- Unit 2 M-439 Sh 4 10.4-13 Condensate and Feedwater System 2

Sh 3

- Unit 2 M-440A 10.4-4 Condensate Demineralizer System 3

Sh 1

- Unit 1 i

{

M-440B 10.4-4 condensate Demineralizer System 3

Sh 2

- Unit 1 M-441A 10.4-5 Condensate Demineralizer System 1

l Sh 1

- Unit 1 I

M-441B 10.4-5 Condensate Demineralizer Syste.n 2

Sh 2

- Unit 1 M-442A 10.4-6 Condensate Demineralizer System 2

Sh 1

- Unit 2 8

Revision 33 4/81

MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continuedl Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-442B 10.4-6 Condensate Demineralizer System 2

Sh 2

- Unit 2 M-443A 10.4-7 Condensate Demineralizer System 1

Sh 1

- Unit 2 M-443B 10.4-7 Condensate Demineralizer System 3

Sh 2

- Unit 2 M-444 Sh A 10.4-25 Feedwater Chemical Addition System 1

Sh 1 M-444 Sh B 10.4-25 Feedwater Chemical Addition System 2

Uh 2 M-.'45 Sh 1 9.3-7 Steam Plant Sample System 3

M-445 Sh 2 9.3-8 Steam Plant Sample System 3

M-445 Sh 3 9.3-9 Steam Plant Sample System 3

M-445 Sh 4 9.3-10 Steam Plant Sample System 3

M-445 Sh 5 9.3-11 Steam Plant Sample System 3

M-445 Sh 6 9.3-12 Steam Plant Sample System 3

M-445 Sh 7 9.3-13 Steam Plant Sample System 3

M-445 Sh 8 9.3-14 Steam Plant Sample System 3

M-44LA 10.4-3 Circulating Demineralizer -

3 Sh 1 Units 1 & 2 M-446B 10.4-3 Circulating D mineralizer -

3 Sh 2 Units 1 & 2 M-446C 10.4-3 Circulating Demineralizer -

0 l

Sh 3 Units 1 & 2 M-448 Sh 1 9.3-1 Instrument and Service Air 7

M-448 Sh 2 9.3-2 Instrument and Service Air 9

M-449 Sh 1A 9.2-18 Plant Water Storage and Transfer 3

Sh 1 9

Revision 33 4/81 l,

MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-449 Sh 1B 9.2-18 Plant Water Storage and Transfer 3

Sh 2 M-449 Sh 2 9.2-19 Plant Water Storage and Trans:Ter 6

M-452 Sh 1A 9.5-25 Emergency Diesel Engine Oil Storage 3

sh 1 and Transfer System M-452 Sh 1B 9.5-25 Emergency Diesel Engine Oil Storage 3

Sh 2 and Transfer System M-453 9.4-10 HVAC Auxiliary Building Units 1 & 2 7

M-454 Sh 1 9.4-3 HVAC Auxiliary Building Units 1 & 2 6

M-454 Sh 2 9.4-4 HVAC Auxiliary Building Units 1 & 2 4

M-454 Sh 3 9.4-5 HVAC Auxiliary Building Units 1 & 2 5

M-454 Sh 4 9.4-6 HVAC Auxiliary Building Units 1 & 2 3

M-454 Sh 5 9.4-7 HVAC Auxiliary Building Units 1 & 2 6

M-454 Sh 6 9.4-7A HVAC Auxiliary Building Units 1 & 2 0

M-455 Sh 1 9.4-8 HVAC Turbine Building Unit 1 3

M-455 Sh 2 9.4-9 HVAC Turbine Building Unit 2 3

M-456 Sh 1A 9.4-13 Plant Heating Turbine Building 2

Sh 1 M-456 Sh 1B 9.4-13 Plant Heating Turbine Building 0

Sh 2 M-456 Sh 1C 9.4-13 Plant Heating Turbine Euilding 0

Sh 3 M-456 Sh 2A 9.4-14 Plant Heating Turbine Building 2

Sh 1 M-456 Sh 2B 9.4-14 Plant 3 eating Turbine Building 2

Sh 2 M-456 Sh 3A 9.4-15 Plant Heating Office and Service 2

Sh 1 Buildings 10 Revision 33 4/81

B MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-456 Sh 3B 9.4-15 Plant Heating Office and Service 1

Sh 2 Buildings M-456 Sh 4 9.4-16 Plant Heating Miscellaneous Structures 4

M-457 Sh 1A 9.2-20 Chilled Water Auxiliary Building 1

Sh 1 M-457 sh 1B 9.2-20 Chilled Water Auxiliary Building 1

Sh 2 M-457 Sh 2A 9.2-2 Chilled Water Safeguard Equipment 3

Sh 1 Unit 2 M-457 Sh 2B 9.2-2 Chilled Water Safeguard Equipment 3

Sh 2 Unit 2 M-457 sh 3A 9.2-25 Chilled Water Safeguard Equipment 3

Sh 1 Unit 2 M-457 Sh 3B 9.2-25 Chilled Water Safeguard Equipment 3

Sh 2 Unit 2 M-457 Sh 4A 9.2-21 Chilled Water Turbine Building Unit 1 1

Sh 1 M-457 Sh 4B 9.2-21 Chilled Water Turbine Building Unit 1 0

Sh 2 M-157 Sh SA 9.2-22 Chilled Water Turbine Building Unit 2 2

Sh 1 M-457 Sh SB 9.2-22 Chilled Water Turbine Building Unit 2 0

i Sn 2 l

M-457 Sh 6 9.2-23 Chilled Water Office and Service 6

i Buildings M-458 Sh 1A 9A-30 Fire Protection 2

i Sh 1 M-458 Sh 1B 9A-30 Fire Protection 3

Sh 2 M-458 Sh IC 9A-30 Fire Protection 3

Sh 3 11 Revision 33 4/81

MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-458 Sh 2 9A-30 Fire Protection 3

Sh 4 M-459 Sh 1A 9.2-12 Domestic Water 2

Sh 1 M-459 Sh 1B 9.2-12 Domestic Water 2

Sh 2 M-459 Sh 2 9.2-12 Domestic Water 5

Sh 3 M-459 Sh 3 9.2-12 Domestic Water 4

Sh 4 M-460 Sh 1 10.4-20 Process Steam, Supply and Return System 6

M-460 Sh 2A 10.4-21 Process Steam, Supply and Return System 1

Sh 1 M-460 Sh 2B 10.4-21 Process Steam, Supply and Return System 2

Sh 2 M-460 Sh 3A 10.4-22 Process Steam, Supply and Return System 2

Sh 1 M-460 Sh 3B 10.4-22 Process Steam, Supply and Return System 1

Sh 2 M-460 Sh 4 10.4-22A Process Steam, Supply and Return System 4

M-461 Sh 1A 10.4-14 Process Steam Evaporator System 2

Sh 1 M-461 Sh 1B 10.4-14 Process Steam Evaporator System 1

Sh 2 M-461 Sh 2A 10.4-15 Process Steam Evaporator System 3

Sh 1 M-461 Sh 2B 10.4-15 Process Steam Evaporator System 2

Sh 2 M-461 Sh 2C 10.4-15, Process Steam Evaporator System 0

Sh 3 12 Revision 33 4/81

_____3 4A c)g,*f

%g*$

s

_e.._ 1.

TEST TARGET (MT-3) l[sman l.0

' ly I!!llE u'.i'"llla I.8 1.25 IA I.6 6~

=

Ak*'i

'Sk*

//

v a

A dIfk h

TEST TARGET (MT-3) t

[

1.0 g m gg

!j y,,

O!!lE I. l )= 5 NA I

l.8

[j l.25 l

1.4 1.6 4

6"

/+4 4W &///,

%,b$.

e 4,,,,

y

l Th'

/

c 'o

\\.

//

TEST TARGET (MT-3)

W

[F m UM l.0

@LE I.l'{"3 lillM

~

l14 1.25

.4 1.6 l.

6" r$!st *%,,

f4%

F $////

$3,4. f 4,,

O MIDLAND 1&2-FSAR Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-461 Sh 3A 10.4-16 Process Steam Evaporator System 2

Sh 1 M-461 Sh 3B 10.4-16 Process Steam Evaporator System 1

Sh 2 M-461 Sh 4A 10.4-17 Process Steam Evaporator System 1

Sh 1 M -461 S:1 4B 10.4-17 Process Steam Evaporator System 1

Sh 2 M-461 Sh SA 10.4-18 Process Steam Evaporator System 1

Sh 1 M-461 Sh SB 10.4-18 Process Steam Evaporator System 2

Sh 2 M-461 Sh 6 10.4-1?

Frocess Steam Evaporator System 5

M-461 Sh 7 10.4-19 Process Steam Evaporator. System 3

Sh 1 M-461 Sh 8 10.4-19 Process Steam Evaporator System 2

Sh 2 M-462 9.4-10A HVAC - Reactor Building 7

M-463 Sh 1A 9.3-41 Miscellaneous Gas System Hydrogen 2

Sh 1 Supply M-463 Sh 1B 9.3-41 Miscellaneous Gas System Hydrogen 2

Sh 2 Supply M-463 Sh 2A 9.3-43 Miscellaneous Gas System Carbon Dioxide 2

Sh 1 Supply M-463 Sh 2B 9.3-43 Miscellaneous Gas System Carbon Dioxide 2

Sh 2 Supply M-463 Sh 3 9.3-42 Miscellaneous Gas System Nitrogen 3

Supply M-464 10.4-24 Cooling Pond Blowdown and Makeup System 6

M-465 Sh 1 9.4-1 HVAC-Control Room-Battery Room-5 Switchgear and Cable Spreading Room 13 Revision 33 4/81

MIDLAND 1&2-FSAR Pining and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-465 Sh 2 9.4-2 HVAC-Control Room-Battery Room-5 Switchgear and Cable Spreading Room M-466 9.4-12 HVAC Access Control and Computer Area 5

M-467 Sh 1 9.4-17 HVAC Office and Service Buildings 1

M-467 Sh 2 9.4-18 HVAC Office and Service Buildings 1

M-467 Sh 3 9.4-18A HVAC Office and Service Buildings 1

M-468 Sh 1 9.4-11 HVAC Diesel Generator Building and 3

Service Water Pump Structure M-468 Sh 2 9.4-20 Miscellaneous Structures HVAC 2

M-468 Sh 3A 9.4-19 Miscellaneous Building HVAC System 0

Sh 1 Evapoarator and Auxiliary Boiler Building M-468 Sh 3B 9.4-19 Miscellaneous Building HVAC System 0

Sh 2 Evaporator and Auxiliary Boiler Building M-468 Sh 4 9.4-21 Miscellaneous Structure HVAC 2

(Guard House)

M-468 Sh 5 9.4-22 Miscellaneous Structures HVAC 2

M-468 sh 6 9.4-22, Miscellaneous Structures HVAC 0

Sh 1 M-469A 9.3-39 Boron Recovery Degasifier 2

Sh 1 M-469B 9.3-39 Baron Recovery Degasifier 2

i Sh 2 M-470 Sh 1A 9.5-30 Chemical and Oily Waste System 2

Sh 1 l

M-470 Sh 1B 9.5-30 Chemical and Oily Waste System 2

Sh 2 M-470 Sh 2A 9.5-29 Chemical Waste System 2

Sh 1 14 Revision 33 4/81

MIDLAND 1&2-FSAR j

Piping and Instrumentation Diagrams (continued)

Bechtel FSAR Dwg No.

Fig No.

FSAR Figure Title Rev M-470 Sh 2B 9.5-29 Chemical Waste System 2

Sh 2 M-472 Sh 1 6.2-119 Miscellaneous Instrumentation Reactor 1

Building - Unit 1 M-472 Sh 2 6.2-120 Miscellaneous Instrumentation Reactor 1

Building - Unit 2 M-478 Sh 1 11.6-1, Preliminary Process Steam Radiation 1

Sh 1 Monitoring Online Monitoring System M-478 Sh 2 11.6-1, Preliminary Process Steam Radiation 1

Sh 2 Monitoring online Monitoring System M-478 Sh 3 11.6-1, Preliminary Process Steam-Radiation 1

Sh 3 Monitoring Online Monitoring System M-478 Sh 4 11.6-1 Preliminary Process Steam Radiation 1

Sh 4 Monitoring Online Monitoring System 15 Revision 33 4/81