Text
{{#Wiki_filter:r - (/d.
- pa arrg'o,
UNITED S TATES l ' 3 .,., ~j NUCLEAR REGULATORY COMMISSION
r REGION ill o, 8 7M ROOSEVELT ROAD Y %.....o GLEN ELLYN,lLLINOIS 60137 April 10, 1981 /k)1Y1 Docket No. 50-10 / g' , Docket No. 50-237 Docket No. 50-249 [[ U/4y 0 7 IO81 A8 Commonwealth Edison Company 9 ~ ATTN: Mr. Cordell Reed u.s, g Q ' g % Vice President c - Post Office Box 767 % 7 Chicago, IL 60690 g 4 to Gentlemen: " This refers to the routine inspection conducted by Messrs. W. L. Axelson, J. P. Patterson, and M. P. Phillips of this office on March 25, 1981, of activities of the Dresden Nuclear Generating Station, Units 1, 2 and 3, authorized by hTC Operating Licenses No. DPR-2, No. DPR-19 and No. DPR-25 and to the discussion of our findings with Mr. V. L. Chaney, D. Farrar, and others of your staff at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures, observations, and interviews with personnel. No items of noncompliance with NRC requirements were identifted during the course of this inspection. We are concerned about the use of the glass sample vial and the associated handling of this vial during the drill witnessed by us during this inspec- tion. The enclosed inspection report delineates areas whicn need improvement. Specifically, we feel your interim post accident primary coolant sampling procedure and sampling equipment are inadequate. We request that you give this matter your attention and inform us by letter within twenty-five days of your action to correct it. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC's Fublic Document Room, except as follows. If the enclosures contain information that you or 8105110//9- 0
7 -- . . . Commonwealth Edison Company -2- your contractors believe to be proprietary, you must apply in writing to this office, within twenty-five days of the date of this letter, to withhold such information from public disclosure. The application must include a full statement of the reasons for which the information is considered proprietary, . and should be prepared so that proprietary information identified in the application is contained in an enclosure to the application. We will gladly discuss any questions you have concerning this inspection. Sincerely, . A. Hind, Acting Director D vision of Emergency Preparedness and Operational Support Enclosure: IE Inspection Peport Nos.: 50-10/81-04, 50-237/81-08, 50-249/81-05 cc w/ encl: J. S. Abel, Director of Nuclear Licensing D. J. Scott, Station Superintendent Central Files Reproduction Unit NRC 20b AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Mary Jo Murray, Office of Assistant Attorney General _ }}