MAY 6 1981 I8 Docket No.: 50-341 MEMORANDUM FOR:
B. J. Youngblood, Chief, Licensing Branch No.1, DL FROM:
L. L. Xintner, Project Manager, Licensing Branch No.1, DL
SUBJECT:
MEETING WITH DETROIT EDISON REGARDING THE REVIEW OF THE FERMI 2 APPLICATION FOR AN OPERATING LICENSE hwI
] M Y)197f
~
DATE AND TIME:
N, ; - Mg 0, '981.-
9:00 AM LOCATION:
Fermi 2 Plant Monroe, Michigan PURPOSE:
To review design and view installation of selected safety-related electrical equipment. (Agenda attached).
PARTICIPAtGS:
Detroit Edison Company L. Schuerman, W. Fahrner, J. Honkala, W. Colbert NRC Staff Robert Fitzpatrick, A. Saeed v
L. L. Kintner, Project Manager Licensing Branch No.1 Division of Licensing Attachment cc: See next page b
8/ 0 $60 ObTV f
Mr. Harry Tauber Vice President Engineering & Construction Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 cc:
Eugene B. Thomas, Jr., Esq.
David E. Howell, Esq.
LeBoeuf, Lamb, Leiby & MacRae 21916 John R 1333 New Hampshire Avenue, N. W.
Hazel Park, Michigan 48030 Washington, D. C.
20036 Mr. Bruce Little Peter A. Marquardt, Esq.
U. S. Nuclear Regulatory Commission Co-Counsel Resident Inspector's Office Th'e Detroit Edison Company 6450 W. Dixie Highway 2000 Sc:ond Avenue Newport, Michigan 48166 Detroit, Michigan 48226 Dr. Wayne Jens Mr. William J. Fahrner Detroit Edison Company Project Manager - Fermi 2 2000 Second Avenue The Detroit Edison Company Detroit, Michigan 48226 2000 Second Avenue Detroit, Michigan 48226 Mr. Larry E. Schuerman Detroit Edison. Company 3331 West Big Beaver Road Troy, Michigan 48084
-7.--
a AGENDA FOR SITE VISIT - POWER SYSTEMS 1.
Preliminary Discussions a.
Unresolved items (degraded grid voltage) b.
Plant layout for touring 2.
Control Room a.
General layout b.
Diesel control board c.
Cabling in control room (separation, loading, etc.)
d.
Engineered safety feature ' titiation and bypass switch arrangements and status panels.
e.
Power system control and mimic panel f.
0.C. system monitoring and alarms 3.
Cable Runs and Cable Spreading Area a.
General layout b.
Degree of separation c.
Diverse wiring d.
Tray or wireway dens'ty (percentage fill).
i e.
Penetrations ar.d cable terminations.
f.
Identification of cables and raceways 4.
Switchgear Rooms a.
General layout b.
Physical and electrical separation of redundant units c.
Potential for damage due to fire, missiles, etc.
f
---p
-y-g m--
,- - - ~ -
. d.
Cable installation 5.
Battery and Charger Installations a.
General layout L.
Physical and electrical separation c.
Potential for damage due to fire, missiles, etc.
d.
Ventilation independence e.
Monitoring instrumentation, and alarms 6.
Diesel Generators a.
General laycut b.
Physical and electrical separation of redundant units c.
Fuel supply system d.
Diesel generator local control panel (s) and instruments and controls 7.
Switchyard a.
General luyout b.
Physical and electrical separation of transmission circuits, buses, breakers, and control circuits c.
Relay house d.
Control power supplies (AC and DC) e.
Potential for damage due to fire, flooding, missiles, etc.
l
8.
Reactor Building a.
General layout b.
Potential for cable damage due to fire, missiles, pipe breaks, etc.
c.
Separation of piping and cable to redundant equipment 9.
Shutdown Outside Control Room a.
Remote shutdown panels arrangement, separation, and layout b.
potential for damage due to fire, missiles, etc.
c.
identification of control and monitoring equipment
- 10. Relay Room a.
General layout b.
Nuclear and reactor protection instrument cabinet arrangement, separation, and identification c.
Potential for damage due to fire, missiles, etc.
- 11. ESF Systems and Pumo Rooms a.
General layout b.
Physical and electrical separation of redundant equipment c.
Potential for damage due to fire, missiles, etc.
d.
Cable and raceway layout e.
Identification of cables, raceways, and equipment
.~
ii 12. Vital Instrumentation Power Supply Installation a.
General layout b.
Physical and electrical separation Potential for damage from fire, missiles, etc.
c.
d.
Monitoring instrumentation e.
cable and raceway layout f.
Identification of cables, raceways, and equipment
o 4
("t36SO MEETING NOTICE _DISTRIB_UTION N
6S 6
J. Stolz NRC PCR S. Hanauar Local POR P. Collins TIC D. Vassallo NSIC D. Ziemann Branch File T. Murley N. Hughes F. Schroeder E. Case K. Kniel D. Eisenhut D. Skovholt R. Purple G. Knighten T. Novak M. Erns t
- 5. Varga R. Baer T. Ippolito E. Adensam R. A. Clark A. Thadani R. Reid ACRS (16)
R. Tedesco Attorney, OELD J. Youngblood 0IE (3)
A. Schwencer 050 (7)
F. Miraglia Project fianager L. L. Kin _tner t
J. R. Miller e
A Licensing Assistant ti. Rushb_ rook G. Lainos
' g Receptionis t D. Crutchfield r
i TERA g
W. Russell r
,h J. LeDoux, I&E J. Olshinki 1.U V. Moore
=
R. Vollmer 5
MAi O 61981 > -.}
I&E Headquarters R. Bosnak I&E Region I
~ "D.T" N@
I&E Region II F. Schauer R. E. Jackson
~~
/
I&E Region III G. Lear
/'
/
I&E region IV V. Nocnan 4
I&E Region V S. Pawlicki V. Benaroya NRC
Participants:
Z. Rosztoczy W. Haass R. Fitzpatrick I
D. Muller A. Saeed R. Ballard W. Regan J. D. Saltzman D. Ross P. Check Chief, Power Systems Branch
- 0. Parr bcc: Applicant & Service List F. Rosa W. Butler W. Kreger R. W. Houston l
Chief. Radiological Assessment Branch l
W. Gammill L. Rubenstein T. Speis a tz l
r.
Dagano l
S. Ramos l
J. Kramer l
$$***sgerb
-