e',e LONG ISLAND LIGHTING COM PANY 7
/g,gg c,o, SHOREHAM NUCLEAR POWER STATION faggf P.O. BOX 610, NORTH COUNTRY ROAD
- WADING RIVER. N.Y.11792 SNRC-556
~
e A
April 13, 1981 p
/g f
[U P
's k
lu I91 Mr. Boyce Grier, Director I' Y O 41981.- ri Office of Inspection & Enforcement (E k DJe % ue m T
" " * " (f U.S. Nuclear Regulatory Commission ey King of Prussia, Pa 19406 g.
q I&E BULLETIN 8G-25 SHOREHAM NUCLEAR POWER STATION - UNIT 1 DOCKET NO. 50-322
Dear Mr. Grier:
IE Bulletin 80-25 describes several instances of malfunctioning of two-stage, pilot-operated, Target Rock safety-relief valves (SRV).
Briefly, the malfunctions were due to solenoid actuator failure (excess Loc-Tite in solenoid plunger), foreign material lodged in the main valve seat and excessive pneumatic supply pressure to the solenoid actuator.
The Shoreham Nuclear Power Station is equipped with identical valves.
As directed by the bulletin, the following actions have been or are being undertaken:
1)
We will initiate appropriate quality control procedures to assure inspection of the solenoid actuator for excess Loc-Tite in accordance with manufacturer's recommendations.
2)
Plant Staff and Startup have been notified of the require-ment to remove the entire valve from service for disassembly, inspection and adjustment if it fails to function as designed.
3)
A review of our SRV pneumatic supply overpressure protection is nearly complete.
Any required modifications will be implemented prior to Fuel Load.
Operating procedures will be prepared to address operator response to overpressure conditions.
In response to your request for information to assist in evaluating the value/ impact of each bulletin, we estimate that approximately 48 engineering manhours have been expended in responding to this bulletin.
' _, s Mr. Boyca Grier, Director April 13, 1981 Page two We have no estimate at this time of manpower associated with any potential corrective actions.
We trust that the above information has been responsive to your rcquest.
Should you require additional information, please do not hesitate to contact us.
Very truly yours, CM e
y J.
P.
N varro Project Manager Shoreham Nuclear Power Station JAR /mc cc:
Mr. Victor Stello, Director NRC Office of Inspection & Enforcement Division of Reactor Operations Inspection Washington, D.C.
20555 Mr. J. Higgins NRC, Trailer Site
- = :-.
.~.C..
O 4
-_..