UNITED STATES
NUCLEAR REGULATORY COMMISSION
-
.**
REGION IV
".
. ..
4'
611 RYAN PLAZA DRIVE, SU TE 1000
.
,8
ARUNGTON, TEXAS 76011
,
March 20, 1981
_
f, 191
In Reply Refer To:
r .[L
.
Docket No. 50-267/81-03
g
g
,;
-
.?
WlY041981
T
Public Service Company of Colorado
I@' "
ATTN: Mr. C. K. Millen
Q
Senior Vice President
c/7
P. O. Box 840
a
G
Denver, Colorado 80201
Gentlemen:
This refers to the inspection conducted under the Resident Inspection Program
by Messrs. M. W. Dickerson and G. L. Plumlee III, of this office during the
period February 1-28, 1981, of activities authorized by NRC Operating License
No. DPR-34 and to discussions of the findings with members of your staff at the
conclusion of the inspection.
Areas examined during the inspection and the findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
During this inspection it was found that certain of your activities were not
conducted in full compliance with NRC requirements.
Consequently, you are
required to respond to this matter, in writing, in accordance with the pro-
visions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
Code of Federal Regulations.
Your response should be based on the specifics
contained in the Notice of Violation enclosed with this letter.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Cade of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any infonnation that you (or your coteactors} believe to be
proprietary, it is necessary that you make a written applicati 4n within 25 days
of the date of this letter to this office to withhold such inf rmation from
public disclosure. Any such application must include a full siatement of the
reasons on the basis of which it is claimed that the information is proprietary,
and should be prepared so that proprietary information identified in the
application is cor.cained in a separate part of the document.
If we do not
hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
810 5 06 0 $O'[
.
.
Public Service Company of Colorado
2
March 20, 1981
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
,
fk&cb&
'
G. L. Madsen, Chief
Reactor Projects Branch
Enclosures:
1.
2.
IE Inspection Report No. 50-267/81-03
cc w/ enclosures:
D. W. Warembourg, Nuclear Production Manager
Fort St. Vrain Nuclear Station
P. O. Box 368
Platteville, Colorado 80651
L. Brey, Quality Assurance