Forwards IE Insp Rept 50-327/81-06 on 810223-26.No Noncompliance Noted
ML20003H489
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/30/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20003H490 List:
References
NUDOCS 8105060120
Download: ML20003H489 (2)


See also: IR 05000327/1981006

Text

).m aeTuq

[Q

o

h

UNITED STATES

-.E.M

~i,

NUCLEAR REGULATORY COMMISSION

'

g

c

REGION 11

f

101 MARIETTA ST., N.W., SulTE 3100

r3

g

ATLANTA, GEORGIA 30303

MAR 301981

g[a *

f_d[IM'/ () .y 7

-

ff

'

Tennessee Valley Authority

'

,

h

'C

ATTN:

H. G. Parris

Manager of Power

_

'

500A Chestnut Street Tower II

Chattanooga, TN 37401

"\\ u.s. D g s p oer

i

\\b

ph

Gentlemen:

Subject: Report N6327/81M

This refers to the routine safety inspection conducted by G. A. Belisle and

others of this office on February 23-26, 1981, of activities authorized by NRC

Operating License No. OPR-77 for the Sequoyah facility and to the discussion of

our findings held with J. M. McGriff and W. E. Andrews at the conclusion of the

inspection.

This inspection was a comprehensive examination of your management and quality

assurance controls related to licensed activities. Inspection was conducted in

selected key areas of responsibilty at both the plant site and your corporate

offices. Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

Four new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this of'fice

to withhold such information from public disclosure. Any such application sust

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

8105060120

L -

1

.

n4AR 30l 1981

.

.

.

Tennessee Valley Authority

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,

JEI.($$

R. C.

s, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure: Inspection Report No.

50-327/81-06

cc w/ encl:

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

H. J. Green, Division Director

~

s

.

,

- -,,

, . . , - . .

--,-c.

...n.-.,

, . , ,

, . . , ~ .

, . . - , ,

, . ,

, . , , , , . - . - . - - -

...-- ,

.,