See also: IR 05000213/1980025
Text
/
.
,.
Ib
o
UNITED STATES
[
fgg
NUCLEAR REGULATORY COMMISSIIN
L
j
REGION I
631 PARK AVENUE
Q,
g
%
,e
KING OF PRUSSIA. PENNSYLVANIA 19406
2 7 MAR 1931
Docket No. 50-213
e
A
S
%
~
TI
N
s
C9t
Connecticut Yankee Atomic Power Company
'
ATTN: Mr. W. G. Counsil
IJAY 0 419815 -
'
Vice President - Nuclear
_
j
e?o
%.
u. s.
Engineering and Operations
coa w ss a
.,7
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-213/80-25
This refers to the routine inspection conducted by Mr. T. Jackson of this office
on December 2-5, 1980 at the Haddam Neck Plant, Haddam, Connecticut, and at
the Northeast Utilities Service Company, Berlin, Connecticut of activities
authorized by NRC License No. OPR-61 and to the discussions of our findings
held by Mr. Jackson with Mr. Graves arJ other members of your staff at the
conclusion of the inspection, and to subsequent telephone discussions between
Mr. Jackson and Mr. J. Doroski of your staff on January 22 and 28,1981.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report con-
tains any information that you (or your contractor) believe to be proprietary,
l
it is necessary that you make a written application within 20 days to this
office to withhold such information f om public disclosure. Any such applica-
tion must be accompanied by an affidavit executed by the owner of the information,
which identifies the document or part sought to be withheld, and which contains
a statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.
The infermation sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
!
p
81050eo060
.
.
Connecticut Yankee Atomic Power Company
2
"
2 7 ER 1981
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sinc rely,
.
.
u
Gary
. Sn er,
lef
Eme ency Prepa edness and
P ogram Support
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-213/80-25
cc w/ encl:
,
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer