Corrected Page 72 to Tech Specs Issued on 810311 W/Amends 70 & 66 to Licenses DPR-33 & DPR-52,respectively,reflecting Changes Made by Amends 48 & 46
ML20003H423
Person / Time
Site: Browns Ferry  
Issue date: 03/11/1981
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20003H424 List:
References
NUDOCS 8105050841
Download: ML20003H423 (2)


Text

e O:

N T:.5 FoK TABLE 3.2.3 (Centinued) 10.

Only one trip system for each cooler fan.

1.1.

In on.ly two of the four 4160 V shutdown boards. See no:s 13.

12.

In only ene of the four 4160 V shutdown boards. See note 13.

13. An emergency 4160 V chutdown board is et..tsidered a ::dp sys:e=.

14 pnw pu: p would be inoperable. Refer to sectics 4.5.C for the

.requirenents of a RES*J pump being inoperable.

L5. ne acciden: signal' is the satisf actory complezien of a ene-ou:-ef-tw taken tvies logic of the dryvell high pressure plus lew rese:cr pres sure or the vessel low water level (L.378" above vessil :ero) originating' in th*e core spray sys:em trip system.

16.

he ADS circuitry is capable of acce=plishing its protactive seti:n with one ope:able trip system. Therefore ene ::1p systen =.sy be :aken out of service for functienal testi=g and calibra:1e: !=: a period not.

o exceed 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

17. Two RPT systems exist, either of which will trip both recirculation pumps. The systems will be individually functionally tested monthly.

If the test period for one RPT system exceeds 2 consecutive hours, the system wil,l' be declared inoperable.

If both RPT systems are inoperable or if 1 RPT system is inoperable for more than 72 consecutive hours, an orderly power reduction shall be initiated and the reactor power shall be less than 85% withir 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

l t

6/05696 l

72 A endment flo. 48 l

l

ym'E5 702 TARLE 3. 2. 5 (Conciaued) 10.

caly one trip system for auch cooler f an.

11.

In only two of the four 4160 V shutdown boards. see note 13.

12.

In ocly one of the four 4160 V shutdown boards. See note 13.

1J.

An emergency 4160 V. shutdown board La considerad a trip syacc:.:.

14 rat.sv pump would be inoperable.

E.sf er to sacties 4.5.C for ti.a' requirsa.ance of a 1315'4 pump beint in rperable.

15. ne accident signal is the satis f actory c:=splecian cf a c::,-wt-c!-c4 taken twice loste of the dryvell high pressure plus Icv rcatter pros-sors or the rassel low water level (t 376* above ve;2c1 rero) odgissting is the core spesy systcm trip systas.
16. na A'JS circuitry is capable of accomplishing its protective actice with i,ee operable trip systea. Therefore one trip systss ts7 be taken out of service for functional testing and calibratica for a p riod not to exceed 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
17. Two RPT systens exist, either of which vill trip both recirculatien" pu=ps.

The systens vill be individually functionally tested ncnthly.

If the test period for one RPT systen exceeds 2 consecutive hours, the systen vill be declared 'noperable. If both RPT systens are inoperable or if 1 PST systen is insperable for core than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, an orderly po er reduction shall be initiated and reactor power shall be' less than 85~

vithin 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

&B&gezcy A

d- 'a : No,,4, 46

-