y
l>
UNITED STATES
y
NUCLEAR REGULATORY COMMISSION
n
b
.E
REGION 111
+
799 ROOSEVELT ROAD
o
GLEN ELLYN. ILLINOIS 60137
.....
March 24, 1981
/ c)
S
/
.,
s
,
e
gy g
. {
' -)
/[,
Docket No. 50-10
'
-
Docket No. 50-237
2(
4
-
Docket No. 50-249
APR 2 41981 > 1
[
Commonwealth Edison Company
' #SsY
.s/
co
ATTN:
Mr. Cordell Reed
N-
'h
f3
Vice President
Post Office Box 767
tJ7T -
Chicago, IL 60690
Gentlemen:
This refers to the routine inspection conducted by Messrs. T. M. Tongue
and M. J. Jordan of this office on January 1-30, 1981, of activities at
Dresden Nuclear Power Station, Units 1, 2, and 3, authorized by NRC
Operating Licenses No. DPR-02, No. DPR-19, and No. DPR-25 and to the
discussion of our findings with Mr. D. Scott, Station Superintendent,
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirem'ents, as described in the enclosed
Appendix A, and a written response is required.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
Public Document Room, except as follows.
If the enclosures contain
information that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twenty-five days of the date
of this letter, to withhold such information from public disclosure.
The
application must include a full statement of the reasons for which the
information is considered proprietary, and should be prepared so that
proprietary information identified in the application is contained in
an enclosure to the application.
81050504 %
,
- . -
,
Commonwealth Edison Company
-2-
March 24, 1981'
We will gladly discuss any questions you have concerning this' inspection.
Sincerely,
2
,
. F. Heishman, Acting Director
Division of Resident and
Project Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-010/81-02, No.
50-237/81-03 and No.
50-249/81-02
cc w/encls:
J. S. Abel, Director
of Nuclear Licensing
D. J. Scott,
Station Superintendent
Central Files
Reproducti)n Unit NRC 20b
Resident Inspector, RIII
Local PDR
Mary Jo Murray, Office
of Assistant Attorney
General