FP W shington Public Power Supply System A JCINT OPERATING AGENCY P.O. SOX 964 3000 GEO WASHINGTON WAY RICHLAND, WASHINGTON 99352 PHONE (509) 372-5000 April 28,1981 G01-81-121
/ e-r s o Docket Nos. 50-460 d\\N
'.,N
/S7 CW
!f fEbiW$b}'
50-513 iil MM 0 41981*
Office of Nuclear Reactor Regulation 7 v.waus umnoss U.S. Nuclear Regulatory Commission U\\
SC" *
- Washington, D.C. 20555 l
?
! W*
ATTENTION: Ms. E.G. Adensam, Chief Licensing Branch No. 4
Dear Ms. Adensam:
Subject:
SUPPLY SYSTEM NUCLEAR PROJECTS NOS. 1 AND 4 SUBMITTAL OF FSAR SECTION 2.5 The Supply System plans to submit the WNP-1/4 FSAR for acceptance review in December 1981.
Because WNP-2 and WNP-1/4 are both located on the Hanford Site and because the WNP-2 application is currently undergoing active review, we propose that subsections 2.5.1 through 2.5.3 (Basic Geologic and Seismic Information, Vibratory Ground Motion and Surface Faulting) of the WNP-1/4 FSAR be omitted and in their place we provide reference to these subsections of the WNP-2 FSAR. This would be of advantage to the Staff in that there would be only one geology / seismology document to review and there would be no questions of differences that could exist between two submittals.
This concept of referencing the WNP-2 FSAR and the plan and schedule for future amendments to the geology / seismology section of the WNP-2 FSAR were discussed with the Staff during a March 31 meeting on the WNP-2 review.
In order for us to omit Subsections 2.5.1 through 2.5.3 from the WNP-1/4 FSAP., we will need agreement from the NRC that such an omission will not b e. used by the Staff as a basis for failure of the WNP-1/4 FSAR to pass the acceptance review.
- 810500C g A
Ms. ' E.G. Adensam, Chief.
April 28,.1981 Page Two
-G01-81-121 To aid in our preparation of the WNP-1/4 FSAR, we will need the above.
requested concurrence by July-1, 1981.
Very truly yours, Mb G.D. Bouchey. (
Director, Nuclear Safety GDB/AGH/p:n cc: C.R.' Bryant, Bonneville Power Administration A. Bournia, fluclear Regulatory Cormiission A. Medici, United Engineers & Constructors, Inc.
WNP-1/4 Files FDCC