ML20003G486

From kanterella
Jump to navigation Jump to search
Submits Update Re Actions in Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Audit & Field Correction Phase Completed.Seismic Piping Sys Redocumentation Program Scheduled for mid-1983 Completion
ML20003G486
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/20/1981
From: Swart F
PUBLIC SERVICE CO. OF COLORADO
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
FOIA-81-95 IEB-79-14, P-81019, NUDOCS 8104290649
Download: ML20003G486 (2)


Text

..s

.]

puhuc seMee company e cracm50

)

To ADM/DMB:

~

January 20, 1981 POR Fort St. Vrain LPOR Unit No. I

@NeIQ@

\\

P-81019 gi F'

/TI ACM/RSB

.Gs s

i APR3qD81Ahg Mr. Karl V. Seyfrit, Director

,y Nuclear Regulatory Commission

~ : 0.s Region IV

%,kgg Office of Inspection and Enforcement W)

J 511 Ryan Plaza Drive s

4 P

Suite 1000 Arlington, TX 76012

Subject:

Supports for 2" and Under Piping

References:

PSC Letter P-77199, dtd 09/29/77 PSC Letter P-77229, dtd 11/17/77 PSC Letter P-77237, dtd 12/01/77 PSC Letter P-78159, dtd 09/29/78 PSC Letter P-80442, dtd 12/23/80

Dear Mr. Seyfrit:

In a letter dated September 29, 1978, Public Service Company of Colorado informed the NRC that, based upon sample aucit findings, further analysis and a complete walk-down of the 2" and Under Class I piping supports at the Fort St. Vrain facility would be made to ensure that all suppor cs were correctly documented.

The estimated completion date for this work was September,1979.

The walk-down was completed by that l

date as was the majority of the analysis.

In July, 1979, the NRC l

issued I&E Bulletin 79-14 requiring an audit of all Class I 21/2" l

and Larger Class 1 piping and all computer analyzed 2" and Under Piping.

Because 4 the time requirements of the bulletin, the bulletins emphasis on 21/2" and Larger piping and the effort recuired to satisfy the requirements of the bulletin; the remainder of the analysis, redrafting and craft action work associated with the 2" and Under program has proceeded on a low priority basis.

As reported in PSC reference correspondence P-80442, the effort l

associated with the audit and field correction phase of I&E Bulletin 79-14 has been completed and we have now entered into the Seismic Piping System Redocumentation Program.

This program involves both piping systems 21/2" and larger and 2" and smaller is scheduled for completion in mid-1983.

Most of the remaining 2" and Under analysis has to be performed in parallel with the analysis of the 21/2" and Larger redocumentation program and is now considered by PSC to be part of that program.

The remaining craft action work associated with the 2" and Under program has been scheduled to be perrormed in parallel with the 21/2" and larger redocumentation program.

The anticipated completion date for the small bore program is December, 1982.

8104290 N h

P-81019 Page 2 January 20, 1981 In the future, PSC will refer to both programs as a single seismic redocumentation program and will report the status of this program on a semi-annual basis as previously committed.

If there are any questions, please contact this office.

Very truly yours, 7

N A

Frederic E. Swart Nuclear Project Manager FES:pa 1

'Rc I

f

.w,.--,.,--------------._,-,e-

--,.----,-w--

_