Text
r f
APRIL 5 net 1
(,
D I TR "" "" -
TERA PShemanski Gray File
-c"'
NSIC RPrevatte NRC PDR ORB #2 Rdg PTriplett L POR DEisenhut RFitzpatrick g nif,2 Docket No. 50-333 TIppolito AUngaro s
',A SNorris ASaeed 9
PPolk OELD p
RMattson AE00 4p p$
2g7 p
FRosa IE-3 e
Mr. George T. Berry President and Chief Operating _ Office #r.
I Power Authority of the State of New 3
%7,g%g%A 77 4
York 4
10 Columbus Circle U
//g
Dear Mr. Berry:
By letter dated August 8,1979 you were requested to review the electric power systems at the James A. FitzPatrick Nuclear Power Plant. Your response was fonvarded by letters dated September 7,1979 and July 1, 1980.
We have reviewed your responses and by the enclosed Safety Evaluation concur in the conclusicns to:.(1) complete the proposed modification to transformer taps on the 600V emergency load center transfonner, and (2) verify by testing that the offsite power system and onsite distribution system will be capable of providing acceptable voltages.
You are requested to pmvide the results of verification tests within 30 l
days after the conclusion of your next refueling outage.
If we can be j
of further assistance, please advise.
i Sincerely, 1
Crfginal s!gned by Thomas A. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing
Enclosures:
1.
Safety Evaluation 2.
Technical Evaluation Report cc w/ enclosures:
Semnext page 1
1 c" c5 >.0RB #2.: DL.,.l.0.RB d2:DL.C).,j..
l 5"""k.Pfo.lk/.co...!.T. p o.i
. f.
4
N
.I
..l.
]...
I
.j.
- yician ascono copy w+
,= x
.c g g
+-
/[
o,,
UNITED STATES NUCLEAR REGULATORY COMMISSION y) 5., ( 3 g wAnHNGTON. D. C. 20565 j
t{..CM,/
April 15,1981 Docket No. 50-333 Mr. George T. Berry President and Chief Operating Officer Power Authority of the State of New York 10 Columbus Circle New York, New York 10019
Dear Mr. Berry:
By letter dated August 8,1979 you were requested to review the electric power systems at the James A. FitzPatrick Nuclear Power Plant. Your response was forwarded by letters dated September 7,1979 and July 1, 1980.
l We have reviewed your responses and by the enclosed Safety Evaluation concur in the conclusions to: (1) complete the proposed modification to transformer taps on the 600V emergency load center transfonner, and (2) verify by testing that the offsite power system and onsite distribution system will be capable of providing acceptable voltages.
You are requested to provide the results of verification tests within 30 days after we conclusion of your next refueling outage.
If we can be l
of further assistance, please advise.
Sincerely,
. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing
Enclosures:
1.
Safety Evaluation 2.
Technical Evaluation Report cc w/ enclosures:
See next page i
i l
Mr. George T. Berry cc:
Mr. Charles M. Pratt Assistant General Counsel Power Authority of the State of New York 10 Colurbus Circle New York, New York 10019 Mr. J. Phillip Bayne Senior Vice President -
Nuclear Generation Power Authority of the State of New York 10 Columbus Circle -
New York, New York 10019 Mr. Raymond J. Pasternak Resident Manager James A. FitzPatrick Nuclear Pcwer Plant P. O. Box 41 Lycoming, New York 13093 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 George M. Wilverding Manager-Nuclear Licensing 10 Columbus Circle NewYork,f{ewYork 10019 State University College at Oswego Penfield Library - Documents Oswego, New York 13126 Resident Inspector c/o U. S. NRC P. O. Box 136 Lycoming, New York 13093
- -.