ML20003F941
| ML20003F941 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 04/10/1981 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Liner F DAIRYLAND POWER COOPERATIVE |
| References | |
| NUDOCS 8104230932 | |
| Download: ML20003F941 (4) | |
Text
A' i.ssfd l/h a
APR 101981 P I.m l
h h
)_
Docket No. 50-409 gt.,
M Dairyland Power Cooperative T.
h"t-g ATTN:
Mr. F. W. Linder 7
/
f(/g General Manager a
de 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:
In reference to our letter of March 1, 1979, this letter is to provide update information concerning admittance of Region III personnel to your facilities. indicates Region III personnel for whom permanent non-employee, no escort required picture badges, as authorized by 10 CFR 73.55(d)(5), are requested. Region III personnel listed in Enclosure 2 are requested to be badged for unescorted access in the protected area only. The information contained in the enclosures is effective upon receipt.
If you have any questions concerning this matter, we will be happy to discuss them with you.
Sincerely, James G. Keppler Director
Enclosures:
Access Lists Identified as Enclosures 1 and 2 l
~
cc w/encls:
R. E. Shimshak, Plant l
Superintendent Central Files RIII RIII RIII RIII RI I RIII i
C' Stapleto,n/sp eed Fisharq Nye Davis
}er 4/6/81
(
ql9 f[f
/gl nt
. :Q
e ACCESS LIST Site:
LACBWR Date:
April 9, 1981 The below listed individuals are likely to visit your facilities, on an announced or unannounced basis at any time, day or night, as frequently as two or more times per year, and are required to be provided permanent non-employee, no escort required picture badges as authorized by 10 CFR 73.55(d)(5). Consistent with normal escort requirements, these individuals may act as escort for other NRC personnel, consultants and contractors. These individuals shall be afforded access to protected and vital areas consistent with the requirements of your local procedures.
(Note: Those individuals marked with an asterisk
- require access only to selected vital areas.)
As indicated below, a "Q" access authorization is based on a full-field investigation conducted by the Civil Service Commission, the Federal Bureau
' of Investigation or another U.S. Government agency which conducts personnel security investigations. The "L" clearance is based on a National Agency Check conducted by the Civil Service Commission.
Name RIII Organization NRC Badge No.
Clearance K. R. Baker Engineering Inspection A200 Q
K. Connaughton Engineering Inspection A052 Q
M. Gildner Engineering Inspection A060 Q
J. Grobe Engineering Inspection A062 Q
M. M. Holzmer Engineering Inspection Allo Q
J. B. Hopkins Engineering Inspection B044 L
W. Key, Jr.
Engineering Inspection A058 Q
J. Peschel Engineering Inspection A111 Q
M. Ring Engineering Inspection B055 L
D. Robinson Engineering Inspection B077 L
J. Schapker Engineering Inspection A158 Q
R. D. Schulz Engineering Inspection
~ A119 Q
A067 Q
K. D. Ward Engineering Inspection I. T. Yin Engineering Inspection A112 Q
R. Ar Paul Technical Inspection A050 Q
i W. L. Axelson Emergency Preparedness A161 Q
W. B. Grant Emergency Preparedness A047 Q
J. A. Pagliaro Emergency Preparedness A054 Q
J. P. Patterson Emergency Preparedness A021 Q
M. Phillips Emergency Preparedness B056 L
M. Branch Reactor Projects A072 Q
B. Forney Reactor Projects A071 Q
Eaclosure 1 g
ACCESS LIST Site: LAC 3WR Date: April 9, 1981 The below listed personnel may visit your facilities on an announced or unannounced basis at any time, day or night. After they have presented official identification, they are to be processed into your facility in the same manner as a non-regular employee. They are to be badged for unescorted access to the protected area. They shall be afforded access according to your procedures, without any delays other than those normally involved with entrance search and personal identification and registration.
4 As indicated below, a "Q" access authorization is based on a full-field investigation conducted by the Civil Service Commission, the Federal Bureau of Investigation or another U.S. Government agency which cenducts personnel security investigations. The "L" clearance is based on a National Agency Check conducted by the Civil Service Ccemission.
Name RIII Orranizatica NRC Badge No.
Clearance J. G. Keppler RIII, Director A001 Q
R. Burton Office of the Director A009 Q
A. B. Davis Office of the Director A005 Q
J. Foster Office of the Director A010 Q
R. J. Marabito Office of the Director A019 Q
J. McCarten Office of the Director A011 Q
G. A. Phillip Office of the Director A012 Q
G. W. Roy Office of the Director A002 Q
W. H. Schultz Office of the Director A144 Q
R. Strassa Office of the Director A018 Q
J. Streeter Office of the Director A147 Q
~
C. Weil Office of the Director A013 Q
C. E. Norelius
+DETI, Director A007 Q
P. Barrett Engineering Inspection A141 Q
D. Danielson Engineering Inspection A043 Q
F. Hawkins Engineering Inspection A143 Q
I. Jackiw Engineering Inspection A063 Q
R. Landsman Engineering Inspection B029 L
R. Lanksbury Engineering Inspection A059 Q
F. A. Maura Engineering Inspection A066 Q
R. Spessard Engineering Inspection A106 Q
. t C. Williams Engineering Inspection B014 L
J. L. Belanger Technical Inspection A023 Q
G. M. Christoffer Technical Inspection A024 Q
J. R. Creed Technical Inspection A099 Q
A. G. Finley Technical Inspection A020 Q
V. L. Fisher Technical Inspection A046 Q
+ Division of Engineering and Technical Inspection f
Page 1 of 2 1
D
+ut-T v-y 9
,,.a
,e r
m
LACEWR Name RIII Organization NRC Badee No.
Clearance R. L. Greger Technical Inspection A048 Q
L. J. Hueter Technical Inspection A053 Q
J. R. Kniceley Technical Inspection A026 Q
P. Lovendale Technical Inspection A116 Q
T. J. Madeda Technical Inspection A027 Q
D. E. Miller Technical Inspection A051 Q
C. C. Peck Technical Inspection A108 Q
G. Pirtle Technical Inspection A025 Q
B. W. Stapleton Technical Inspection A130 Q
J. A. Hind
++DEPOS, Director A004 Q
A. G. Januska Emergency Preparedness A076 Q
N. A. Nicholson Emergency Preparedness A104 Q
M. Oestmann Emergency Preparedness A031 Q
C J. Paperiello Emergency Preparedness B024 L
M. Schumacher Emergency Preparedness A107 Q
N. C. Choules Performance Appraisal A061 Q
D. Hunter Perfonaance Appraisal 2005 L
F. J. Jablonski Performance Appraisal A041 Q
W. D. Shafer Performance Appraisal 3033 L
G. Fiorelli Reactor Projects A006 Q
L. McGregor Reactor Projects A146 Q
J. Schaack Reacter Prcjects R. F. Warnick Reactor Projects A033 Q
++ Division of Emergency Preparedness and Operational Support
(
Page 2 of 2
-.