ML20003F873

From kanterella
Jump to navigation Jump to search
Forwards Updated Info Re Admittance of Region 3 Personnel to Facilities
ML20003F873
Person / Time
Site: Dresden, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 04/10/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8104230797
Download: ML20003F873 (16)


Text

f a

L w, x

.m APR 1 0 m

-Y j

l. h $ '

.s

~

b N

{j* y q.

Docket Nos. 50-10, 50-237, 50-249; 50-254, 50-265; 50-295, g

50-304; 50-373, 50-374

,W7 g

/7 Commonwealth Edison Company to 8 m

ATTN:

Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

In reference to our letter of March 1,1979, this letter is to provide update information concerning admittance of Region III personnel to your facilities. indicates Region III personnel for whom permanent non-employee, no escort required picture badges, as authorized by 10 CFR 73.55(d)(5), are requested. Region III personnel listed in Enclosure 2 are requested to be badged for unescorted access in the protected area only. Tae information contained in the enclosures is effective upon receipt.

If you have any questions concerning this matter, we will be happy to discuss them with you.

Sincerely, James G. Keppler Director

Enclosures:

Access Lists Identified as Enclosures 1 and 2 cc w/encls:

D. J. Scott, Station Superintendent Mr. N. Kalivianakis, Plant Superintendent i

Mr. K. L. Graesser, Station i

Superintendent l

Mr. R. H. Holyoak, Station Superintendent Central Files RIII RIII RIII RIII RIII RIII b

CDI Stapleton/np Creed Fishe No?ptius D7vis Kepgler 4/6/31 j 1;'f %e ih8 y

](q(St t/I gfgg g

i 8104 ed 07 9 7. a c.f.lgjgi 1.0 I

6 4

ACCESS LIST Site: Dresden Date: April 9, 1981 The below listed individuals are likely to visit your facilities, on an announced unannounced basis at any time, day or night, as frequently as two or more times per year, and are required to be provided permanent non-employee, no escort required picture badges as authorized by 10 CFR 73.55(d)(5). Consistent with normal escort requirements, these individuals may act as escort for other NRC personnel, consultants and contractors. These individuals shall be afforded access to protected and vital areas consistent with the requirements of your local procedures.

(Note: Those individuals marked with an asterisk

  • require access only to selected vital areas.)

As indicated below, a "Q" access authorization is based on a full-field investigation conducted by the Civil Service Commission, the Federal Bureau of Investigation or another U.S. Government agency which conducts personnel security investigations. The "L" clearance is based on a National-Agency Check conducted by the Civil Service Commission.

Name RIII Organization NRC Badge No.

Clearance K. R. Baker Engineering Inspection A200 Q

K. Cornaughton Engineering Inspection A052 Q

M. Gildner Engineering Inspection A060 Q

J. Grobe Engineering Inspection A062 Q

M. M. Holzmer Engineering Inspection A110 Q

J. B. Hopkins Engineering Inspection B044 L

W. Key, Jr.

Engineering Inspection A058 Q

J. Peschel Engineering Inspection A111 Q

M. Ring Engineering Inspection B055 L

D. Robinson Engineering Inspection.

B077 L

J. Schapker Engineering Inspection A158 Q

R. D. Schulz Engineering Inspection A067 Q

K. D. Ward Engineering Inspection A119 Q

I. T. Yin Engineering Inspection A112 Q

R. AT Paul Technical Inspection A050 Q

W. L. Axelson Emergency Preparedness A161 Q

W.' B. Grant Emergency Preparedness A047 Q

J. A. Pagliaro Emergency Preparedness A054 Q

J. P. Patterson Emergency Preparedness A021 Q

M. Phillips Emergency Preparedness B056 L

N. Chrissotimos Reactor Projects A156 Q

S. DuPont Reactor Projects A097~

Q M. Jordan Reactor Projects A123 Q

F. Reimann Reactor Projects B049 L

(

Page 1 of 2

k i

i

~

Dresden -

I i

f Name RIII Organization NRC Badge No.

Clearance

5. Shepley Reactor Projects B069 L

T. Tongue Reactor Projects A102 Q

R. Walker Reactor Projects A154 Q

H. Wescott Reactor Projects A037 Q

i

'I i

i i

1 1

I -

i

}

i.

I 1

i j

1 i

I i

4 i

i 1-L t

i l

e i

t, 4

Enclosure.

('

i Page 2 of 2 I

.t a

k u**N w-4ds e w rw--h--+my

  • me y yg*qy

.---g nww-m*-gw-9-3-tr'M-F'79T%4M ayy,e $v 1-

"-- gt We

  • 7-G"*m-+-e n-b e e-*y,

.YTed'a'-c'uT ?g W g V-

eT"'"

=w-')

"N' '

-7+"-'%

7'

'^ ~ ' ' "

~

ACCESS LIST Site: Dresden Date: April 9, 1981 The below listed personnel may visit your facilities on an announced or unannounced basis at any time, day or night. After they have presented official identification, they are to be processed into your facility in the same manner as _ a non-regular employee. They are to be badged for unescorted access to the protected area. They shall be afforded access according to your procedures, without any delays other than those normally involved with entrance search and personal identification and registration.

As indicated below, a "Q" access authorization is based on a full-field investigation conducted by the Civil Service Commission, the Federal Bureau of Investigation or another U.S. Government agency which conducts personnel security investigations. The "L" clearance is based on a National Agency Check conducted by the Civil Service Commission.

Name RIII Organization NRC Badge No.

Clearance J. G. Keppler RIII, Director A001 Q

R. Burton Office of the Director A009 Q

A. B. Davis Office of the Director A005 Q

J. Foster Office of the Director A010 Q

R. J. Marabito Office of the Director A019 Q

J. McCarten Office of the Director A011 Q

G. A. phillip Office of the Director A012 Q

G. W. Roy Office of the Director A002 Q

W. H. Schultz Office of the Director A144 Q

R. Strasma Office of the Director A018 Q

J. Streeter Office of the Director A147 Q

C. Weil Office of the Director A013 Q

C. E. Norelius

+DETI, Director A007 Q

P. Barrett Engineering Inspection A141 Q

D. Danielson Engineering Inspection A043 Q

F. Hawkins Engineering Inspection A143 Q

I. Jackiw Engineering Inspection A063 Q

R. Landsman Engineering Inspection B029 L

R. Lanksbury Engineering Inspection A059 Q

F. A. Maura Engineering Inspection A066 Q

R. Spessard Engineering Inspection A106

,Q C. Williams Engineering Inspection B014 L

J. L. Belanger Technical Inspection A023 Q

G. M. Christoffer

< Technical Inspection A024 Q

l l

J. R. Creed Technical Inspection A099 Q

A. G. Finley Technical Inspection A020 Q

W. L. Fisher Technical Inspection A046 Q

+ Division of Engineering and Technical Inspection I

Page 1 of 2

Dresden Name RIII Organization NRC Badge No.

,Clea rance R. L. Greger Technical Inspection A048 Q

L. J. Hueter Technical Inspection A053 Q

J. R. Kniceley Technical Inspection A026 Q

P. Lovendale Technical Inspection A116 Q

T. J. Madeda Technical Inspection A027 Q

D. E. Miller Technical Inspection A051 Q

C. C. Peck Technical Inspection A108 Q

G. Pirtle Technical Inspection A025 Q

B. W. Stapleton Technical Inspection A130 Q

J. A. Hind

++DEPOS, Director A004 Q

A. G. Januska Emergency Preparedness A076 Q

N. A. Nicholson Emergency Preparedness A104

'Q M. Oestmann Emergency Preparedness A081 Q

C. J. Paperiello Emergency Preparedness B024 L

M. Schumacher Emergency Preparedness A107 Q

N. C. Choules Performance Appraisal A061 Q

D. Hunter Performance Appraisal B005 L

F. J. Jablonski Performance Appraisal A041 Q

W. D. Shafer Performance Appraisal B033 L

A. Schock Reactor Projects AC37 Q

++ Division of Emergency Preparedness and Operational Support

(

Page 2 of 2

~

ACCESS LIST Site: Quad Cities Date: April 9, 1981 The below listed individuals are likely to visit your facilities, on an announced or unannounced basis at any time, day or night, as frequently as two or more times per year, and are required to be provided permanent non-employee, no escort required picture badges as authorized by 10 CFR 73.55(d)(5). Consistent with normal escort requirements, these individuals may act as escort for other NRC personnel, consultants and contractors. These individuals shall be afforded access to protected and sital areas consistent with the requirements of your local procedures.

(Note: Those individuals marked with an asterisk

  • require access only to selected vital areas.)

As indicated below, a "Q" access authorization is based on a full-field investigation conducted by the Civil Service Commission, the Federal Bureau of Investigation or another U.S. Government agency which conducts personnel security investigations. The "L" clearance is based on a National Agency Check conducted by the Civil Service Commission.

Name RIII Organization NRC Badge No.

Clearance K. R. Baker Engineering Inspection A200 Q-K. Connaughton Engineering Inspection A052 Q

M. Gildner Engineering Inspection A060 Q

J. Grobe Engineering Inspection A062 Q

M. M. Holzmer Engineering Inspection A110 Q

J. B. Hopkins Engineering Inspection B044 L

W. Key, Jr.

Engineering Inspection A053 Q

J. Peschel Engineering Inspection A111 Q

M. Ring Engineering Inspection B055 L

D. Robinson Engineering Inspection B077 L

J. Schapker Engineering Inspection A158 Q

R. D. Schulz Engineering Inspection A067 Q

K. D. Ward Engineering Inspection A119 Q

I. T. Yin Engineering Inspection A112 Q

I L. J7 Hueter Technical Inspection A053 Q

W. L. Axelson Emergency Preparedness A161 Q

W. B. Grant Emergency Preparedness A047 Q

J. A. Pagliaro Emergency Preparedness A054 Q

l J. P. Patterson Emergency Preparedness A021 Q

M. Phillips Emergency Preparedness B056 L

N. Chrissotimos Reactor Projects A156 Q

S. DuPont Reactor Projects A097 Q

M. Jordan Reactor Projects A123 Q

l F. Reimann Reactor Projects B049 L

f Enclosure ~1

(

Page 1 of 2 1

(

Quad Cities Name RIII Organization NRC Badge No.

Clearance S. Shepley -

Reactor Projects B069 L

T. Tongue Reactor Projects A102 Q

R. Walker Reactor Projects A154 Q

H. Wescott Reactor Projects A037

-Q.

1 O

Page 2 of 2

o ACCESS LIST Site: Quad Cities Date: April 9,1981 The below listed personnel may visit your facilities on an announced or unanacunced basis at any time, day or night. After they have presented j

official identification, they are to be processed into your facility in the same manner as a non-regular employee. They are to be badged for unescorted access to the protected area. They shall be afforded access according to your procedures, without any delays other than those normally involved with entrance search and personal identification and registration.

As indicated below, a "Q" access authorization is based on a full-field investigation conducted by the Civil Service Cocnission, the Federal Bureau of Investigation or another U.S. Government agency vnich conducts personnel security investigations. The "L" clearance is based on a National Agency Check conducted by the Civil Service Commission.

]

Nace RIII Organization NRC Badze No.

Clearance J. G. Eeppler KIII, Director ACC1 Q

R. Burton Office of the Director A009 Q

A. B. Davis Office of the Director A005 Q

l J. Foster Office of the Director A010 Q

R. J. Marabito Office of the Director A019 Q

J. McCarten Office of the Director A011 Q

G. A. Phillip Offire of the Director A012 Q

G. V. Roy Office of the Director ACO2 Q

V. H. Schultz Office of the Director A144 Q

j R. Strassa Office of the Director 1018 Q

J. Streeter Office of the Director A147 Q

C. Veil Office of the Director A013 Q

C. E. Norelic;

+DET';, Director A007 Q

P. Barrett Engineering Inspection A141 Q

D. Danielson Engineering Inspection A043 Q

F. Hawkins Engineering Inspection A143 Q

1. Jackiv Engineering Inspection A063 Q

R. Landsman Engineering Inspection 3029 L

R. Lanksbury Engineering Inspection A059 Q

F. A. Maura Engineering Inspection A066 Q

R. Spessard Engineering Inspection A106 Q

C. Williams Engineering. Inspection B014 L

.)

J. L. Belanger Technical Inspection A023 Q

G. M. Christoffer Technical Inspection A024 Q

j J. R. Creed Technical Inspection A099 Q

A. G. Finley Technical Inspection A020 Q

V. L. Fisher Technical Inspection A046 Q

< Division of Engineering and Technical Inspection 1

g Page I cf 2

-._----n,-

Quad Cities Name RIII Organization NRC Badge No.

Q1earance R. L. Greger Technical Inspection A048 Q

J. R. Kniceley Technical Inspection A026 Q

P._Lovendale Technical Inspection A116 Q

T. J. Madeda Technical Inspection A027 Q

D. E. Miller Technical Inspection A051 Q

R. A. Paul Technical-Inspection A050 Q

C. C. Peck Technical Inspection A108 Q

G. Pirtle Technical Inspection A025 Q

B. W. Stapleton Technical Inspection A130 Q

J. A. Hind

++EEPOS, Director A004 Q

A. G. Januska Emergency Preparedness A076 Q

N. A. Nicholsca Emergency Preparedness A104 Q

". Oestmann Emergency Preparedness A081 Q

C. J. Paperiello Emergency Preparedness B024 L

M. Schumacher Emergency Preparedness A107 Q

N. C. Choules Performance Appraisal A061 Q

D. Hunter Performance Appraisal B005 L

F. J. Jablonski Performance Appraisal

.A041 Q

W. D. Shafer Performance Appraisal 3033 L

D. Bra-fley Reactor Projects C007 Waiver

++ Division of Emergency Preparedness and Operational Support g

Page 2 of 2-

ACCESS LIST Site: Zion Date: April 9, 1981 The below listed individuals are likely to visit your facilities, on an announced or unannounced basis at any time, day or night, as frequently as two or more times per year, and are required to be provided permanent non-employee, no escort required picture badges as authorized by 10 CFR 73.55(d)(5). Consistent with normal escort requirements, these individuals may act as escort for other NRC personnel, consultants and contractors. These individuals shall be afforded access to protected and vital areas consistent with the requirements of your local procedures.

(Note: Those individuals marked with an asterisk

  • require access only to selected vital areas.)

As indicated below, a "Q" access authorization is based on a full-field investigation conducted by the Civil Service Commission, the Federal Bureau of Investigation or another U.S. Government agency which conducts personnel security investigations. The "L" clearance is based on a National Agency Check conducted by the Civil Service Commission.

Name RIII Organizatica NRC Badge No.

Clearance K. R. Baker Engineering Inspection A200 Q

K. Connaughton Engineering Inspection A052 Q

M. Gildner Engineering Inspection A060 Q

J. Grobe Engineering Inspection A062 Q

M. M. Holzmer Engineering Inspection A110 Q

J. B. Hopkins Engineering Inspection B044 L

W. Key, Jr.

Engineering Inspection A058 Q

J. Peschel Engineering Inspection A111 Q

(

M. Ring Engineering Inspection B055 L

D. Robinson Engineering Inspection B077 L

J. Schapker Engineering Inspection A158 Q

R. D. Schulz Engineering Inspection A067 Q

l K. D. Ward Engineering Inspection A119 Q

I. T, Yin Engineering Inspection A112 Q

D. E. Miller Technical Inspection A051 Q

W. L. Axelson Emergency Preparedness A161 Q

W. B. Grant Emergency Preparedness A047 Q

J. A. Pagliaro Emergency Preparedness A054 Q

J. P. Patterson Emergency Preparedness A021 Q

M. Phillips Emergency Preparedness B056 L

J. E. Kohler Reactor Projects A101 Q

l J. Waters Reactor Projects A098 Q

I l

t l

l l

(

l

ACCESS LIST Site: Zion Date: April 9, 1981 The below listed personnel may visit your facilities on an announced or unannounced basis at any time, day or night. After they have presented official identificstion, they'are to be processed into your facility in the same manner as a non-regular employee. They are to be badged for unescorted access to the protected area. They shall be afforded access according to your procedures, without any delays other than those normally involved with entrance search and personal identification and registration.

As indicated below, a "Q" access authorization is based on a full-field investigation conducted by the Civil Service Commission, the Federal Bureau of Investigation or another U.S. Government agency which conducts personnel security investigations. The "L" clearance is based on a National Agency Check conducted by the Civil Service Commission.

Name RIII Organization NRC Badge No.

Clea rance J. G. Keppler RIII, Director A001 Q

R. Burton Office of the Director A009 Q

A. B. Davis Office of the Director A005 Q

J. Foster Office of the Director

.A010 Q

R. J. Marabito Office of the Director A019 Q

J. McCarten Office of the Director A011 Q

G. A. Phillip Office of the Director A012 Q

G. W. Roy Offica of the Director A002 Q

W. H. Schultz Office of the Director A144 Q

R. Strasma Office of the Director A018 Q

J. Streeter Office of the Director A147 Q

C. Weil Office of the Director A013 Q

C. E. Norelius

+DETI, Director A007 Q

P. Barrett Engineering Inspection A141 Q

D. Danielson Engineering Inspection A043 Q

F. Hawkins Engineering Inspection A143 Q

I. Jackiw Engineering Inspection A063 Q

R. Landsman Engineering Inspection B029 L

R. Lanksbury Engineering Inspection A059 Q

F. A. Maura Engineering Inspection A066 Q

R. Spessard Engineering Inspection A106 Q

C. Williams Engineering Inspection B014 L

J. L. Belanger Technical Inspection A023 Q

G. M. Christoffer Technical Inspection A024 Q

J. R. Creed Technical Inspection A099 Q

A. G. Finley Technical Inspection A020 Q

W. L. Fisher Technical Inspection A046 Q

+ Division of Engineering and Technical Inspection g

Page 1 of 2

Zion 2-Name RIII Organization NRC Badge No.

Clearance R. L. Greger Technical Inspection A048 Q

L. J. Hueter Technical Inspection A053 Q

J. R. Kniceley Technical Inspection A026 Q

P. Lovendale Technical Inspection A116 Q

T. J. Madeda Technical Inspection A027 Q

R. A. Paul Technical Inspection A050 Q

C. C. Peck Technical Inspection A108 Q

G. Pirtle Technical Inspection A025 Q

B. W. Stapleton Technical Inspection A130 Q

J. A. Hind

++DEPOS, Director A004 Q

A. G. Januska Emergency Preparedness A076 Q

N. A. Nicholson Emergency Preparedness A104 Q

M. Oestmann Emergency Preparedness A081 Q

C. J. Paperiello Emergency Preparedness B024 L

M. Schumacher Emergency Preparedness A107 Q

N. C. Choules Performance Appraisal A061 Q

D. Hunter Performance Appraisal B005 L

F. J. Jablonski Performance Appraisal A041 Q

W. D. Shafer Performance Appraisal B033 L

D. W. Hayes Reactor Projects A045 Q

J. H. Neisler Reactor Projects A084 Q

J. Richards Reactor Projects A094 Q

++ Division of Emergency Preparedness and Operational Support

(

Page 2 of 2 y _

s -w p a

pok 4

m

~

^W

ACCESS LIST Site: La Salle Date: April 9, 1981 The below listed individuals are likely to visit your facilities, on an announced or unannounced basis at any time, day or night, as frequently as two or more times per year, and are required to be provided permanent non-employee, no escort required picture badges as authorized by 10 CFR 73.55(d)(5). Consistent with normal escort requirements, these individuals may act as escort for other YRC personnel, consultants and contractors. These individuals shall be afforded access to protected and vital areas consistent with the requirements of your local procedures.

(Note: Those individuals marked with an asterisk

  • require access only

~

to selected vital areas.)

As indicated below, a "Q" access authorization is based on a full-field investigation conducted by tae Civil Service Commissica, the Federal Bureau of Investigation or another U.S. Government agency which conducts personnel The "L" clearance is 'ased on a National Agency security investigations.

c Check conducted by the Civil Service Commission.

Name RIII Orzanization NRC Badge No.

Clearance K. R. Baker Engineering Inspection A200 Q

K. Connaughten Engineering Inspectica A052 Q

M. Gildner Engineer.ng Inspection A060 Q

J. Grobe Engineering Inspection A062 Q

M. M. Holzmer Engineering Inspection Allo Q

J. B. Hopkins Engineering Inspection B044 L

W. Key, Jr.

Engineering Inspection A058 Q

R. Lanksbury Engineering Inspection A059 Q

F. A. Maura Engineering Inspection A066 Q

J. Peschel Engineering Inspection Alli Q

M. Ring Engineering Inspection B055 L

D. Robinson Engineering Inspection B077 L

J. Schapker Engineering Inspection A153 Q

R. D. Schulz Engineering Inspection A067 Q

K. D! Ward Engineering Inspection A119 Q

I. T. Yin Engineering Inspection A112 Q

D. E. Miller Technical Inspection A051 Q

W. L. Axelson Emergency Preparedness A161 Q

W. B. Grant Emergency Preparedness A047 Q

J. A. Pagliaro Emergency Preparedness A054 Q

J. P. Patterson Emergency Preparedness A021 Q

M. Phillips Emergency Preparedness B056 L

(

Page 1 of 2

~

La Salle 2-Name RIII Organization STC Badge No.

Clearance N. Chrissotimos Reactor Projects A156 Q

S. DuPont Reactor Projects A097 Q

M. Jordan Reactor Projects A123 Q

~

F. Reimann Reactor Projects B049 L

?. Shepley Reactor Projects B069 L

T. Tongue Reactor Projects A102 Q

R. Walker Reactor Projects A154 Q

H. Wescott Reactor Projects A037 Q

A i

l l

i t

i e

f l

l

. E J

I i

[

g Page 2 of 2

.-;ee-n o-e'e w-+

+,-

=e---+y wee---r,v---,%,e+

pr yJ-

---., e.wwgey.1.s me

-,*'wwtT-vP-h-'

-*P n c-

+ - -

  • t'=--W--P~

t'rr-**"~e-&#1-nT'"

y T'

"79' 4

y

  • '+'*F'

ACCESS LIST Site: La Salle Date: April 9, 1981 The below listed personnel may visit your facilities on an announced or unannounced basis at any time, day or night. After they have presented official identification, they are to be processed into your facility in the same manner as a non-regular employee. They are to be badged for unescorted access to the protected area. They shall be afforded access according to your procedures, without any delays other than those normally involved with entrance search and personal identification and registration.

As indicated below, a "Q" access authorization is based on a full-field investigation conducted by the Civil Service Commission, the Federal Bureau of Investigation or another U.S. Government agency which conducts personnel security investigations. The "L" clearance is based en a National Agency Check conducted by the Civil Service Commission.

Name RIII Organization NRC Badge No.

Clearance J. G. Keppler RIII, Director A001 Q

R. Burton Office of the Director A009 Q

A. B. Davis Office of the Director A005 Q

J. Foster Office of the Director A010 Q

R. J. Marabito Office of the Director A019 Q

J. McCarten Office of the Director A011 Q

G. A. Phillip Office of the Director A012 Q

G. W. Roy Office of the Director A002 Q

W. H. Schultz Office of the Director A144 Q

R. Strasma Office of the Director A018 Q

J. Streeter Office of the Director A147 Q

C. Weil Office of the Director A013 Q

C. E. Norelius

+DETI, Director A007 Q

P. Barrett Engineering Inspection A141 Q

D. Danielson Engineering Inspection A043 Q

F. Hawkins Engineering Inspection A143 Q

I. Jackiw Engineering Inspection A063 Q

R. Landsman Engineering Inspection B029 L

R. Spessard Engineering Inspection A106 Q

C. Williams Engineering Inspection B014 L

J. L. Belanger Technical Inspection A023 Q

G. M. Christoffer Technical Inspection A024 Q

J. R. Creed Technical Inspection A099 Q

A. G. Finley Technical Inspection A020 Q

W. L. Fisher Technical Inspection A046 Q

R. L. Greger Technical Inspection A048 Q

L. J. Hueter Technical Inspection A053 Q

+ Division of Engineering and Technical Inspection l

l l

g Page 1 of 2

La Salle Name RIII Organization NRC Badge No.

Clearance J. R Kniceley Technical Inspection A026 Q

P. Lovendale Technical Inspection A116 Q

T. J. Madeda Technical Inspection A027 Q

R. A. Paul Technical Inspection A050 Q

C. C. Peck Technical Inspection A108 Q

G. Pirtle Technical Inspection A025 Q

B. W. Stapleton Technical Inspection A130 Q

J. A. Hind

++DEPOS, Director A004 Q

A. G. Januska Emergency Preparedness A076 Q

N. A. Nicholson Emergency Preparedness A104 Q

M. Oestmann Emergency Preparedness A081 Q

C. J. Paperiello Emergency Preparedness B024 L

M. Schumacher Emergency Preparedness A107 Q

N. C. Choules Performance Appraisal A061 Q

i D. Hunter Performance Appraisal B005 L

F. J. Jablonski Performance Appraisal A041 Q

W. D. Shafer Performance Appraisal B033 L

M. E. Locascio Reactor Projects A093 Q

++ Division of Emergency Preparedness and Operational Support i

i i

i t

i l

g Page 2 of 2

{

.. = -

~.. _,.... _.., _ _ _ - _ -

_ _,. _... _ - -.,