Responds to Violations Noted in IE Insp Repts 50-498/80-27 & 50-499/80-27.Corrective Actions:Requirement for Tagging or Segregating Nonconforming Items Clarified
ML20003F629
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/09/1981
From: Oprea G
HOUSTON LIGHTING & POWER CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20003F625 List:
References
ST-HL-AE-601, NUDOCS 8104230240
Download: ML20003F629 (3)


Text

.

'i'he Light O

~

Cornpany a.,osi,,n u hung.gP,> u P.o. m>,ivoo a.,osion.Texa,77ooi (7:3> 228-921 s

.... _.. ~ -

January 9, 1981 ST-HL-AE-601 SFN: C-0570 Mr. W. C. Seidle, Chief Reactor Constmetion 6 Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION RESPONSE TO NRC INSPECTION FINDINGS DOCKET NOS. 50-498/80-27 AND 50-499/80-27

Dear Mr. Seidle:

.e to the item of noncompliance identified The following is our respt in Inspect ~on Report Nos. 50-498/80-27 and 50-499/80-27, dated December 19, 1980.

CORRECTIVE STEPS kHICH HAVE BEEN TAK,EN The specific violation identified was rectified as soon as it was learned that " Hold Tags" had not been properly applied. Subsequently, a Temporary Waiver Request was issued due to the fact that the specifi-cation violation had no quality effect on the concrete produced.

Although the requirement for preventing further use of a nonconforming the proper sequence for tagging or item was clearly a requirement, segregating nonconforming items has been clarified in ST-QAP-15.1, revi.sion 2, approved on January 5, 1981.

I CORRECTIVE STEPS WHICH WILL BE TAKEN 1V AVOID FUR 1HER VIOLATIONS i

During the quarterly refresher training, all Bro'wn & Root Quality Assurance / Quality Control personnel will be trained on ST-QAP-15.1, l

revision 2, with special emphasis on the timeliness of affixing " Hold Tags."

4104230240

}s*ir.t)%,t!.McCcepam Mr. W. C. Seidle Page 2 January 9, 1981 THE DATE hEEN FULL COMPLIANCE WILL BE ACHIEVED 23, 1981.

The quarterly refresher training will be completed by January If you have any questions regarding these commitments, please contact me.

Very truly ypurs,

~

~

c reaf Exec ive ce President GhD:c:nf i

l l

l

~~

t STATE OF TEXAS COUNTY OF HARRIS GEORGE W. OPREA, JR., being first duly sworn, deposes and says: That he is Executive Vice President of HOUSTON LIGHTING &

POWER COMPANY, an Applicant herein; that the foregoing Response to NRC Inspection Findings Docket Nos. 50-498/80-27 and 50-499/80-27 has been prepared under his supervision and direction; that ne knows the contents thereof; and that to the best of his knowledge and belief said documents and the facts contained herein are true and correct.

-, C DATED:

This

/J day of January, 1981.

l

) '

Sign [//$ 4 w

,,2-

[

'orgef.Opreagr.

Subscribed and sworn to before me this 1 2 N ay of January, 1981.

W

/

NotaryPublicinandforthM County of Harris, State of Gexas 1

Mycommissio/

n expires 6-3 C -d I

  • * '~~~