e
101 MARIETTA ST N.W SUITE 3"s0
ATLANTA, GEORGIA 30303
o
FEB 1 31981
Tennessee Valley Authority
p
~9
ATTN:
H. G. Parris
Manager of Power
g
/
/
500A Chestnut Street Tower II
/[
gkg(
{y
Chattanooga, TN 37401
k7
I
~
[%
Gentlemen:
%
8
9
Subject: Report No. 50-327/80-46
4
4
O
This refers to the routine inspection conducted by G. A. Beli lh.o
his office
on December 4-5 and 8-10, 1980, of activities authorized by NRC Operating License
No. DPR-77 for the Sequoyah facility. Our preliminary findings were discussed
with J. M. Ballentine, Sequoyah Plant Superintendent, and A. W. Crevasse, Quality ., s
Assurance Manager at the conclusion of the inspection.
'
This inspection was a comprehensive examination of your management and quality
assurance controls related to licensed activities. Inspection was conducted in
selected key areas of responsibility at both the plant site and your corporate
offices. Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection consisted of
selective examinatio'ns of procedures and representative records, interviews with
personnel, and observations by the inspectors.
.
.
During the inspection, it was. fc. sad that certain activities under your license
appear to violate NRC requiremedts. These items and references to pertinent --
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
In addition to the need for corrective action regarding these specific violations,
3
we are concerned about the implementation of your quality assurance program that
permitted their occurrence. Consequently, in your reply, you should describe in
particular those actions taken or planned to improve the effectiveness of your
i
, , ,
,
quality assurance program.
I
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC Public Document Room. If this report contains
any information that you believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold such informa-
tion from public disclosure. Any such application must include the basis for
claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
810.4210 N
,
- - - ~ . - - - , , - , - - -
_ , -
. , . -
-,
- . , , . _ _ . , . , _ . - ,
- . -
_
.- --
--
._
--
_ _ _ _ -
'
.
.
.
,
Tennessee Valley Authority
-2-
Should you have any qu-stiocs concerning this letter, we will be glad to discuss
them with you.
Sincerely,
O
h_
-
ames
. O'Reilly
rector
-
!
Enclosures:
1.
Appendix A, Notice of Vio
a
2.
Inspection Report No. 50-327/80-46
~
cc w/ encl:
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Berzynski, Projset Engineer
,
H. N. Culver, Chief,' Nuclear Safety
Review Staff
H. J. Green, Division Director
'
,
-
-
...
..
,_,