ML20003F324

From kanterella
Jump to navigation Jump to search
Forwards IE Investigation Repts 50-498/80-08 & 50-499/80-08 on 810119-23 & 0220.No Noncompliance Noted
ML20003F324
Person / Time
Site: South Texas  
Issue date: 03/02/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20003F325 List:
References
NUDOCS 8104200599
Download: ML20003F324 (2)


See also: IR 05000498/1980008

Text

f,J

N,

UNITED STATES

f

[.

,j

A

NUCl. EAR REGULATORY COMMISSION

,

\\ , .

[/ ~ j

7. ()

REGloN IV

S

811 RYAN PLAZA DRIVE. SUITE 1000

ARUNGToN. TEXAS 76011

,

,

March 2, 1981

In Reoly Refer To:

co

RIV

e

Docket No. 50-498/Rpt. 80-08

e

-

f

-

8

~

'lg

50-499/Rpt. 80-08

9

APR 131981* 4

p

-

Houston Lighting and Power Company

TsY" p

ATTN: Mr. G. W. Oprea, Jr.

O

Executive Vice President

/A

/

Post Office Box 1700

47

ro

Houston, Texas

77001

Gentlemen:

This refers to the investigation conducted by Messrs. W. A. Crossman,

W. G. Hubacek and L. D. Gilbert of our staff during the period January 19-23

and February 20, 1981, of activities authorized by NRC Construction Permits

No. CPPR-128 and 129 for the South Texas Project, Units No.1 and 2, in regard

to alleged deficiencies appearing in a Houston Post article, dated February 24,

1980, concerning in-service inspection equipment.

The investigation and our findings are discussed in the enclosed investigation

report.

Within the scope of the investigation, no violations or deviations were identi-

fied.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

investigation report will be placed in the NRC's Public bacument Room.

If the

report contains any information that you believe to be proprietary, it is

,

necessary that you submit a written application to this office, within 25 days

i

of the date o'f this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

why it is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

810.4200 N

h

-_

-

.

..

.-

.

.

O ouston Lighting and Power

H

Company

-2-

March 2, 1981

Should you have any questions concerning this investigation, we will be pleased

i

to discuss them with you.

Sincerely,

-

k

.'

W.C.Seid), Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Investigation Report No. 50-498/80-08

50-499/80-08

1

1

I

.

l

!

I

I

.

.

-