Forwards Request for Addl Info for Chemical Engineering Branch Review of Structural Matls in Control Rod Drive Sys & Secondary Water Chemistry Monitoring & Control Program. Response Should Be Submitted by 810808
ML20003F060
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/14/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Koester G
KANSAS GAS & ELECTRIC CO.
References
NUDOCS 8104200062
Download: ML20003F060 (3)


Text

f s'

UNITED STATES

[ 'f.

J' )

NUCLEAR REGULATORY COf.*. MISSION

'* ! r j

WAS64tNGTON. D. r. 20555 (N T[ /

o.....~

APR 1, L:31 gg w

Docket No.:

STfi 50-482

. D [9 75 l'r. Glenn L. Koester

$3 1

1 4

Vice President - flurlear q

6 Kansas Gas and Electric Company

?

Y,,,

201 North Market Street 4'/

+-

s Wichita, Kansas 67201 i,

Dear Mr. Koester:

Subject:

Request for Additional Information for the Review of the Wolf Creek Plant, Unit 1 - Corrosion Engineering reviews The Chemical Engineering Branch, Divisio of Engineering, routinely'b) secondary (a) structural materials used in the cortrol rod drive system, and water chemistry monitoring and control program.

These areas corr; ad to sections 4.5.1 and 10.3.5 of the SRP. Additional information is required to comolete our review.

Resoonses to the enclosed request should be submitted by August 8,19S1.

Please inform us within seven days af ter receipt of this letter of the date you plan to submit your responses.

Please contact Mr. Drorrerick, Licensing Project Manager, if you desire any discussion or clarification of the enclosed recuest.

Sincerely.

%} ' dQ /.4c<

a:

Robert L. Tedesco, Assistant Director for Licensing Division of Licensing

Enclosure:

As stated cc:

See r. ext page EGO.4200 &

e a..

.,,e

....,.J

.. " ; - 0; ;..

.7..

.t......

O.

.e..

.c...

  • e
  • e.

i

..r.....,

. = F f,'.'

=.".1".

2*>

.."*.. a.

.P.

=.

.... =...

-~~;-

7 J *....

T.....

. a e

,... e..,

7 :.... :.O.L*. *..

,.e t

i..

. 0,1.32

. 7.

...a

e _,,.

v.

.. y.

=*

.Iw

..e: :

. e. i = :

1r

. i...

..:.e

. ~

...z..

.e..

.--.:e.

-:.. ~.

.r

.=7.e

=

1

3. r.

3 e.

T -

.. r..:...,.....

... :. s)

~ -

. :.s.

- :.2

.o...

n. 4.. r.

e.=. l. 3 i

u. l...

u.

.a.

O....

A ;

-w cu r 1100. :e n, h.ansas 0;;J:

..r.,..

r. urbl m

r.

e

..lssouri,,ansas.ect10n:

r. erican nucaear So:1e:v 1:

. ' a,., a h,

. 11

  • 4.

s n.

. s e e.s -~3

.....c..

Ms. Treva Hearne, Assistant Ger.eral Counsei Dublic Service Conmission

e.. n.

o h. - n.

u.12 a v s r.

0,1n.o ve..rson C1..,vy,

  • c

. ie r

5

'.r.

107,hana.el

~

. c.

3. s. r.... n.. c - m. e. o r.s.o i. c r =. =. r,.

.s

.. a c/c US.mC P. n.

e,x.,07 3

v

-s I

-. r :. =, L.,..e 2..

e.n.,

1 t

Mr. "icnael C. Kenner 1

Wolf Creek Project Director State Corporation Commission State of Kansas Fourth Floor, State Office B1cg.

ioreka, h,ansas 60o12 l

i i

I l

\\

l l

ENCLOSURE SNUPPS - WOLF CREEK PLANT, UNIT 1 2P,2.0 wc CORROSION ENGINEERING 282.1 sc To evaluate the compatibility of the control rod drive structural 4.$.1 materials with the reactor coolant water, orovide the list of r.aterials and soecifications which are used for each comoonent of the control rod drive mechanism.

The information in the FSAR dces not adecuately identify the materials.

282.2 wc Provide the following on your secondary water chemistry control and 10.3.5 monitoring programs:

1.

Samoling schedule for the critical parameters and of control points for these parameters for the cold startup mode of operation; 2.

Procedures used to measure the values of the cri+.ical parar.eters; 3.

Procedure for the recording and management of data; 4

Procedures defining corrective actions

  • for off-control coint chem'i~stry conditions; and 5.

A procedure identifying (a) the authority responsible for the inter-pretation of the data and (b) the sequence and timing of administra-tive events required to initiate corrective action.

Verify that the steam generator secondary water chemistry control program incorporates technical recommendations of the NSSS. Any significant deviations from NSSS recommendations should be noted and justified technically.

  • Brancn Technical Position MTEB 5-3 describes the acceptable means for monitoring secondary side water chemistry in PWR steam generators, including corrective actions for off-control point chemistry conditions.

However, the staff is amenable to alternatives, particularly to Branch Technical Position B.3.b(9) of MTEB 5-3 (96-hour time limit to reoair or plug confirmed condenser tube leaks).