Responds to NRC 810126 Ltr Re Violations Noted in IE Insp Repts 50-454/80-24 & 50-455/80-22.Corrective Actions:Anchor Bolts Removed & Replaced & Ultrasonic Exam of Other Equipment Performed
ML20003E809
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/23/1981
From: Abel J
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003E808 List:
References
NUDOCS 8104100634
Download: ML20003E809 (3)


Text

_ ,

J N Commonwealth Edison on) Fir;t National Pf'la. Chic? go. Illincis e.,j JChicago.

minois 60690 Address Reply to: Post Office Box 767 February 23, 1981 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 '

Subject:

Byron Station Units 1 and 2 Response to IE Inspection Reports 50-454/80-24 and 50-455/80-22 NRC Docket Nos. 50-454 and 50-455 Reference (a): January 26, 1981 letter from G. Fiorelli to C. Reed

Dear Mr. Keppler:

Reference (a) contained the report of an inspection conducted by Mr. C. E. Jones of your of fice on December 9-12, 1980 at Byron. During that inspection it was determined that certain activities were in noncompliance with NRC requiremerets. Attachment A to this letter contains Commonwealth Edison's response to the Notice of Violation which was appended to Reference (a).

To the best of my knowledge and celief the statements contained in Attachment A are true anc correct. In some respects these statements are not based on my personal knowledge but upon information furnished by other Commonwealth Edison employees. Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

Please address any questions regarding this matter to this office.

Very truly yours,

a. S. Abel Director of Nuclear Licensing Attachment SUBSCRIBED and SWORN to before mA tryis Yf,a. n ,

day of -M -. . s - ., 1981

/Y. M D_-

Notary Puolic O'333 CG 95N

'" ~

81041oO(o30 L

b

~

ATTACHMENT A Response to Notice of Violation VIOLATION 10 CFR 50, Appendix B, Criterion'II states in part, " Activities affecting quality shall be accomplished under suitably controlled conditions. Controlled conditions include the use of ...; and assurance that all prerequisites for the given activity have been satisfied."

Commonwealth Edison Company Topical Report CE-1-A, " Quality Assurance Program for Nuclear Generating Stations," Revision 9, dated July _16, 1979, states in Paragraph 1.A that " Commonwealth Edison Company is ultimately responsible for the assurance of quality ir all phases of-the design, procurement, construction, modification, testing and operation of the Station... Edison has prime responsibility for controlling the quality of on-site work by field contractors."

Contrary to the above, a number of the anchor bolts for the Unit 2 Essential Service Water (ESW) pump and diesel engine foundation anchor plates were observed to have sharp radius bends which were improperly made to correct gross misalignment with holes in the pump-diesel mounting plates. The Unit 1 pump and diesel had been set previously. Additional investigation indicated the Unit 1 equipment had been mounted and the base grouted covering similarly bent anchor bolts.

Corrective Action Taken and Results Achieved:

s As identified in inspection report, nonconformance report NCR F-514 was initiated on 6/23/80. the anchor bolts were removed and replaced in accordance with design document ECN 1683. The installation of the replaced anchor bolts was inspected by the installing contractors quality control staff and by Commonwealth Edison's quality assurance staff prior to replacement of grout.

Additionally, an ultrasonic examination of a sample of other installed equipment was performed to establish if similar conditions existed. The ultrasonic examinations indicated there were no deficiencies.

Corrective Action Taken to Avoid Further Noncomoliance:

The equipment installation contractor's procedures have been revised to make inspection, by contractor's quality control staff, of anchor oolts prior to release for grouting a mandatory inspection in lieu of an optional inspection. Additionally, increased surveillance by Commonwealth Eoison's quality assurance staff has been uncertaken in the area of equipment installation.

s o ,

Date When Full Comoliance Will Be Achieved:

Replacement of anchor bolts, ultrasonic examination of other installed equipment, and revision to procedures was complete in August 1980.

J 07338

.. .. ..