Summary of 810105-08 Meeting W/Nrc Caseload Forecast Panel & Util at Site Re Progress of Facility Const.Delayed Fuel Load Date of 831231 Predicted for Unit 1 Due to Delays in Hanger & Instrumentation Installation
ML20003A481
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 01/26/1981
From: Rajender Auluck
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8102040120
Download: ML20003A481 (7)


Text

.

[

Io, UNITED STATES NUCLEAR REGULATORY COMMISSION e

n h

WASHINGTON, D. C 20555 JAN 2 s gggy Docket Nos.:

50-454/455 and 50-456/457 APPLICANT: Commonwealth Edison Company FACILITY:

Byron /Braidwood Stations

SUBJECT:

SUMMARY

OF JANUARY 5-8, 1981 CASELOAD FORECAST PANEL MEETING AND SITE VISIT The applicant held meetings with the representatives of NRC's Caseload Forecast Panel at the sites of the Byron and Braidwood Stations. The meeting at the Byron Station was held on January 6 and 7,1981 ;nd the Braidwood meeting was held on January 8,1981. The meeting agendc (Eaclosure 1) and the list of attendees (Enclosure 2) are attached.

The applicant first described the progress of Byron Station construction. As of November 1980, Spool Erection (21/2" and larger subassemblies) was 94%

complete, weldout (21/2" and Larger Piping) 88% complete and 2" and Under Piping was 49% complete. The applicant also indicated that Hangers installation (2 1/2" and Larger Piping) was about 60% mmplete, Electric cable Pans instal-lation was 92% complete, 63% of cables we e pulled and 54% were terminated.

For Braidwood Station, the applicant indicated that Spool Erection (21/2" and larger subassemblies) was 50% complete, weldout (21/2" and larger piping) 45%

complete and 45% of the Hangers (2 1/2" and larger piping) were installed.

Conclusions The applicant is currently behind schedule in Hanger and Instrumentation installation at the Byron Station Unit 1.

Based on the status of construction at this time, the t!RC Panel projected a December 1983 fuel load date f or Byron Station Unit 1 (8 months delay) and concurred with the current April 1985 fuel load date for Braidwood Station Unit 1.

&lwAc--.

R. Aulock, Project Manager Licensing Pranch No. 1 Division of Licensing

Enclosures:

1. Meeting Agenda
2. List of Attendees 81ogg40yao

ENCLOSURE 1 BYFON UNIT 1 AND NEEDED COMMON FACILITIES CASELOAD FORECAST PANEL SITE VISIT MEETING AGENDA t

1.

Overview of project construction schedule including progress and major milestones completed, current problems and any anticipated problem areas that may impact the current projected fuel load date.

2.

Detailed review and current status of design and engineering effort (by major discipline) including any potential problems that may arise from necessary rework.

3.

Detailed review and current status of procurement activities including valves, pipe, instruments, cable, major components, etc.

4.

Actual and proposed craft work force (by major craft), craft 1

availability, productivity, potential labor negotiations and problems.

5.

Detailed review and current status of all large and small bore pipe hangers, restraints, snubbers, etc., including design, rework, procurement, fabrication, delivery and installation.

6.

Detailed review of project schedule identifying critical path items, near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation of corrective action for any activities with negative float, and provisions for contingencies.

The estimated project percent complete as of September 30, 1980.

7.

Detailed review and current status of bulk quantities including i

current estimated quantities, quantities installed to date, quantities scheduled to date, current percent complete for each, actual versus forecast. installation rates, and basis for figures.

(a) Concrete (CY)

(b) Process Pipe (LF)

Large Bore Pipe (2 1/2" and larger)

Small Bore Pipe (2" and smaller)

(c).YardPipe(LF)

(d) Large Bore Pipe Hangers, Restraints, Snubbers (ea)'

i

___.---__--_---_-__---_---__.---______-________-_.-_--_-_-_---.-________---__-_.1._-.________u-__

__--a

t. (e) Small Bore Pipe Hangers, Restraints (ea).

(f) CableTray(LF)

(g) TotalConduit(LF)

(h) Total Exposed Metal Conduit (LF)

(i) Cable (LF)

- Power Control

- Security

- Instrumentation

- Plant Lighting (j) Terminations (ea)

- Power

- Control Security Instrumentation

- Plant Lighting (k) Electrical Circuits (ea) 4

- Power

- Control Security (1) Instrumentation (ea) 8.

Detailed review and current status of prepmt. ion of oreop test procedures, integration of creop ten activities with construction schedule, system turnover ';hedule, preop test schedule, current and proposed preop test program manpower.

(a) Total number of crocedures reautred for fuel load.

(b) Number of draft procedures not started, (c) Number of draft procedures being written.

t l

(d) Number of orocedures approved.

(e) Number of procedures in review.

(f) Total number of oreop tests required for fuel' load.

(g) Number of preoo tests completed.

(h)' Number of oreop tests currently in DroQress.

r (1) Number of systems turned over to start-up.

(

1 l'

~ - -

9.

Detailed discussion of potential schedular influence due to changes attributed to NUREG-0660, NUREG-0694 and other recent licensing requirements.

10. Site tour and observation of construction activities.

1 ll w

I I

T t

ll

+

,_,._..--.....-a.

-......,._._..a.__.,

ATTENDEES (GYRON STATION)

~

Commonwealth Edison Company i

V. I. Schlosser C. J. Tomashek J. T. Vestermeier J. J.Mihovilovich D. Tuetken G. G. Smith i

R. C. Ward l

J.-D. Deress

~

L. A. Bowen K. A. Ainger I

R. E. Querio T. R. Tramm I

P. F. Ervin l-T.'E. Halsleid i

i D. i Lindvall G. Sorensen W. Vahle R. Tuetken j

D. E. St. Clair A. Bielawoki - Attorney i

NRC l

R. Auluck W.H. Lovelace C. E. Jones Intervenors Rockford League-for Women Voters Betty Johnson Connie Ware i

Francis Sapp Dekalb-Area Alliance for Responsible Energy (DAARE)

Prof. Bruce Van Zeller Rockford Register - Star Eileen Peterson.

i.

l 1

J l~

l i

ATTENDEES (BRIADV00D STATION)

Commonwealth Edison Company

w. Vahle i

D. Lambert K. Jones A. Bielawoki L. A. Bowen J. T. Westermeier D. E. Paquette T. Tramm C. Mennecke T. Sommerfield R. Cosaro C. D. Gary J. Merwin R. Schlater F. Kefrom NRC R. Auluck W. H. Lovelace

?

4 a

y f7 Mr. J. 5 Abel f>

Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 757 Chicago, Illinois 60690 ccs:

Mr. William Kortier Mr. Edward R. Crass Atonic Power Distribution Nuclear Safeguards and Licensing Division Westinghouse Electric Corporation Sargent & Lundy Engineers P. O. Box 355 55 East Monroe Street Pittsburgh, Pennsylvania 15230 Chicago, Illinois 60603 Paul M. Murphy, Esq.

Nuclear Regulatory Commission, Region III Isham, Lincoln & Beale Office of Inspection and Enforcement One First National Plaza 799 Roosevelt Road 42nd Floor Glen Ellyn, Illinois 60137 Chicago, Illinois 60603 Myron Cherry, Esq.

Mrs. Phillip B. Johnson Cherry, Flynn and Kanter 1907 Stratford Lane 1 IBM Plaza, Euite 4501 Rockford, Illinois 61107 Chicago, Illinois 60611 Ms. Julianne Mahler Marshall E. Miller, Esq., Chairman Center for Governmental Studies Atomic Safety and Licensing Northern Illinois University Board Panel t

DeKalb, Illinois 60115 U. S. Nuclear Regulatory Commission Washing ton, D. C.

20555 C. Allen Bock, Esq.

P. O. Box 342

. Dr. A. Dixon Callihan Urbanan, Illinois 61820

- Union Carbide Corporation

- P. O. Box Y Thomas J. Gordon, Esq.

Oak Ridge, Tennessee 37830 Waaler, Evans & Gordon 2503 S. Neil' Dr. Richard F. Cole Champaign, Illinois 61820 Atomic Sa'ety and Licensir Board Panel Ms. Bridget Little Rorem U. S. Nuclear Regulatory Commission Appleseed Coordinator Washington, D. C.

20555 117 North Linden Street Essex, Illinois 60935 Kenneth F. Levin, Esq.

Beatty, Levin, Holland, Basofin & Sarsany 11 South LaSalle Street Suite-2200 Chicago, Illinois 60603

/

s.

\\

MEETIfiG

SUMMARY

DISTRIBUTION Docket File G. Lear fiRC PDR V. iloonan Local POR JAh 2 g g S. Pawlicki TIC /flSIC/ Tera V. Benaroya NRR Reading Z. Rosztoczy I

LB#1 Reading W. Haass H. Denton D. Muller i

E. Case R. Ballard D. Eisenhut W. Regan R. Purple D. Ross B. J. Youngblood P. Check A. Schwencer R. Satterfield F. Miraglia

0. Parr J. Miller F. Rosa G. Lainas W. Butler R. Vollmer W. Kreger J. P. Knight R. Houston R. Bosnak i

F. Schauer T. Murphy L. Rubenstein R. E. Jackson T. Speis l

Project Manager o3,,3,,cp aC fl ) c c,o W. Johnston Attorney, OELD " ' ~ ~

J. Stolz M. Rushbrook S. Hanauer OIE (3)

W. Gammill ACRS (16)

T F., Murley R. Tedesco Schroeder N. Hughes D. Skovholt M. Ernst NRC

Participants:

R. Baer C. Berlinger W. H. Lovelace K. Kniel C. E. Jones G. Knighton A. Thadaai D. Tono.

J, Kramer D "1ssallo P. Collins D. Ziemann bcc: Applicant & Service List e

C h

B s

t JAN301937 wf" 5 "'%gm V,

D s

l l

(G l

l

,.-.<,m-,

.,----,---.,..n-,..-------v..--.,-

v,,---.....-.,c.-.


,. -,-.-----..-~ ~--..-~~

,n--.-

-