Forwards IE Insp Repts 50-424/81-03 & 50-425/81-03 on 810212,17 & 18.No Noncompliance Noted
ML20003E657
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/06/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20003E658 List:
References
NUDOCS 8104080012
Download: ML20003E657 (2)


See also: IR 05000424/1981003

Text

r-

s

l /0

%-

0 Mo

'

  • 8

o

UNITED STATES

8y

].

NUCLEAR REGULATORY COMMISSION

y

e

REGION 11

mxk

'

o,,

/

101 MARIETTA ST., N.W.. SUITE 3100

i

p

%

[

ATLANTA, GEORGIA 30303

gp ~~ ' '

'

,9y

ff,

MAR 6

1981

47

- k[,( ' ,;

m

i; ~

e

,

Georgia Power Company

"' t I N /f

% kh

s

7

ATTN: J. H. Miller, Jr.

Executive Vice President

U

N%

  1. .,

/h

270 Peachtree Street

W 'rwds

'

7wi

Atlanta, GA 30303

Gentlemen:

Subject: Report Nos.h8133) ant 5042iI81-l3)

~

This re'fers to the routine safety inspection conducted by J. R. Harris of this

office on February 12,17, and 18,1981, of activities authorized by NRC Con-

struction Permit Nos. CPPR-108 and CPPR-109 for the Vogtle facility and to the

discussion of our findings held with K. M. Gillespie at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10,. Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room. If tnis report

contains any information that you (or your contractor) believe te be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

- the information is proprietary, -and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.

Sinc ely,

I _. .

e

F H UM

~~T . - Lewwpcti ng/Di rec wa r

Division of Resident and

Reactor Project Inspection

Enclosure:

See Page 2-

-

h810408001%

-

>

1

c

' . 'g ,

.

i

,

Georgia. Power Company

2

MAR 6

1981

j

i

Enclosure: Inspection Report Nos.

~ 50-424/81-03 and 50-425/81-03

lcc'w/ enc 1: '

"

'

' '

-

K.' M. Gillespie~, Construction

Project' Manager

E._ D. ' Groover,-QA Site Supervisor

- D., E. Dutton, Project General Manager

i

i

,

,

t

f

d

9-

g

e

r

'/ '

M'

-

s

f

g

,

.

I

'

<

r

,,Z'

p

I

,

-

i

5

l:

.

-

-

!

j .-

-

!

,

,

,.

Y

4

b_ ,

,

4

i

'*

A

g

,

e.'

'

=[ y-

,

,4

-

,.

'

-

'

s ,

_

.,-

a

~

% *

..u

-,

-

-

.

l

.

..

-

o

4

N:

'

,

_

e