ML20003E519

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-213/80-18 on 801006-10 & Notice of Violation
ML20003E519
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/16/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20003E516 List:
References
NUDOCS 8104060027
Download: ML20003E519 (2)


See also: IR 05000213/1980018

Text

_

a

.

.

.

e.S#%

UNITED STATES

4g

y

NUCLEAR REGULATORY COMMISSION

j

g

REGION I

et

'g

431 PARK AVENUE

of

KING OF PRUSSI A. PENNSYLVANI A 19406

Docket No. 50-213

JAN 101931

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

,

Subject:

Inspection Number 50-213/80-18

This refers to the routine inspection conducted by Mr. N. Blumberg of this

office on October 6-10, 1980 at Haddam Neck Plant, Haddam, Connecticut of activities

authorized by NRC License No. DPR-61 and to the discussions of our findings held

by Mr. N. Blumberg with Mr. R. Graves and other members of your staff at the

'

conclusion of the inspection, and to subsequent telephone discussions between

Mr. R. Traggio of your staff and Mr. N. Blumberg on October 22 and 23,1980.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corres-

pondence to you dated December 31, 1974. This notice is sent to you pursuant to

the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations. Section 2.201 requires you to submit to this

!

office, within twenty (20) days of your receipt of this notice, a written state-

(1) corrective steps which have been

ment or explanation in reply including:(2) corrective steps which will be taken

taken by you and the results achievad;

to avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

.81040600 3

- .

- -

. . _

_

. _.

_

-- - .

l

.

.

Connecticut Yankee Atomic Power Company

2

MN 161981

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

i

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you h .ve any questions concerning this inspection, we will be pleased to

discuss them with you.

.

Sincerely,

=

El

J. Brunner, Chief

Rea tor Operations and Nuclear

upport Branch

Enclosures:

1.

Appendix A, Notice of Violation

.

2.

Office of Inspection and Enforcement Inspection

Report Number 50-213/80-18

,

cc w/encls:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

,

J. R. Himmelwright, Licensing Safeguards Engineer

i

f

1

l

.

P

-ww

w,

w

y

.w-

-y-y,--

p.

rwg.av,-

y-

4

g-

a

-


p

e

y