ML20003E323

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-328/81-02 on 810113-16.No Noncompliance Noted
ML20003E323
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/23/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20003E325 List:
References
NUDOCS 8104020887
Download: ML20003E323 (2)


See also: IR 05000328/1981002

Text

.N

0

'

/ge reegD

UNITED STATES

-

o

f

~ ' ,

NUCLEAR REGULATORY COMMISSION

E

REGION 11

2

. 2

101 MARIETTA ST.. N.W., sulTE 3100

T@

[

ATLANTA, GEORGIA 3o3o3

.,

^

FEB 2 31981

-f

'

b

k?O .

9

x _ ~%'l: ?

~

4,

o s

-

,

Tennessee Valley Authority

2

%: 5

V

0

ATTN:

H. G. Parris

G3

, d97

Manager of Power

.A

" %,

},

A

500A Chestnut Street Tower II

'A

~i

Dfy . yd -

'

Chattanooga, TN 37401

c, o ;

Gentlemen:

Subject: Report N

8/81-Oh

This refers to the routine safety inspection conducted by R. W. Wright of this

office on January 13-16, 1981, of activities authorized by NRC Construction

Permit No. CPPR-73 for the Sequoyah facility and to the discussion of our find-

-

ings held with G. G. Stack at the conclusion of the inspection.

'

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviatior.s were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed' in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that. proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,

.<f

<Ar

C. E. Mur

e

,

Reactor Construction and Engineering *

Support Branch

'

'

Enclosure: See Page 2

'8'1040 2 OM

.Ol

. _

-

._.

_

..

-

_

_

E

FIEB 2 3 79g7

'

.

-

Tennessee Valley Authority

2

,

Enclosure:

Inspection Report No. 50-328/81-02

cc w/ enc 1:

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

,

M. J. Burzynski, Project Engineer

'

H. N. Culver, Chief, Nuclear Safety

. Review Staff

,

(

.

i

,r

. .

-

-4

.

.,

.,m

-

y

yy

-

. - - + - ,

-y-

- ,

- - . . , - , ,

-- --

.