ML20003E249
| ML20003E249 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 02/27/1981 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20003E250 | List: |
| References | |
| NUDOCS 8104020657 | |
| Download: ML20003E249 (2) | |
See also: IR 05000440/1981001
Text
_ _ _
_
. - - - -
'o
UNITED STATES
9
8"
" ,%
NUCLEAR REGULATORY COMMISSION
I
E,
E
REGION 111
,
b[
g
799 ROOSEVELT ROAD
%
o
GLEN ELLYN, ILLINolS 6o137
Februa ry 27, 1981
,
-
I
%
Docket No. 50-440
g
Docket No. 50-441
^
~
9]. ,4N gR 0.2 g
'
'
W
d2
The Cleveland Electric Illuminating
Company
~
ATTN: Dalwyn R. Davidson
%
7
Vice President - System
Engineering and Construction
4
p
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine inspection conducted by Messrs. J. E. Konklin
-
and F. C. llawkins of this office on January 21-23, 1981, of activities at
the Perry Nuclear Plant Project, Units 1 and 2, authorized by NRC Construc-
tion Permits No. CPPR-148 and No. CPPR-149 and to the discussion of our
findings with M. R. Edelman and G. V. Groscup and others of your staff at
-
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, al described in the enclosed Appendix A.
As a result of these findings, on January 27, 1981 we issued an Immediate
Action Letter confirming the stop work imposed by you on Metalweld, Inc.,
the site safety-related coatings contractor. Your letter of January 26,
1981 details the corrective actions you are taking in response to the NRC
' inspection findings. No further written response to the findings of this
inspection is required.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as.follows.
If this report contains information that you
%
8184 02 0$ 57
,
,
O
O
The Cleveland Electric Illuminating
-2-
February 27, 1981
Company
,
or your contracters believe to be proprietary, you must apply in writing
to this office, within twenty-five days of the date of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure
to the application.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
a.6S lf*-f
'~
ames G. Keppler
Director
Enclosures:
1.
Appendix A, Notice
of Violation
2.
~ f.E. Inspection Report
No.-50-440/81-01 and
No. 50-441/81-01
cc w/encls:
Central Files
Reproduction Unit NRC 20b.
Local PDR
NSIC-
g
- Harold W. Kohn, Power
Siting Commission'
1 Daniel ~D. Wilt, Attorney
.
Helen W. - Evans, State of Ohio-
.-.
.
S
$
v
d
/
~
.
I-