ML20003E044

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC 810116 Request for Addl Info Re Safeguards Contingency & Physical Security Plans.Response Withheld (Ref 10CFR2.790)
ML20003E044
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/26/1981
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8104020139
Download: ML20003E044 (2)


Text

W PP Washington Public Power Supply System A JOINT CPERATING AGENCY p O.Som946 3000 Geo wasmmerose wa*

RicwLamo waswinerom 99 352 Pwoest ( 909) 375 5000 March 26, 1981

[

Docket No. 50-397 N'

r Mr. B. J. Youngblood g

g

]%

Chief, Light Water Reactors Branch No.1 Division of Licensing T

/lPR 0 419315 U. S. Nuclear Regulatory Commission 9-i Washington, D. C.

20555 u,,,,EMIEPS"

Dear Mr. Youngblood:

A^L A'6/% \\

Subject:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING THE SAFEGUARDS CONTINGENCY PLAN AND THE PHYSICAL SECURITY PLAN FOR WNP-2 The accompanying enclosures represent the Washington Public Power Supply System response to the questions posed in the letter of January 16, 1981 from Mr. R. L. Tedesco, concerning the WNP-2 Safeguards Contingency Plan and Physical Security Plan. provides discussion and rationale, as rpropriate, to the comments provided in Mr. Tedesco's letter.

Enclosse 2 is the revised Safeguards Contingency Plan with pages marked to indicate changed sections. is the revised Physical Security Plan, again with pages marked to indicate changes.

The enclosures contain information concerning detailed security measures for the physical protection of Supply System licensed facilities in which special nuclear material will be used.

This information is to be with-held frcm public disclosure pursuant to Section 2.790(d) of 10 CFR Part 2.

Should you have any questions concerning the Supply System responses or changes to the Plans, please do not hesitate to contact me.

Sincerely, hD%

Gary D. Bouchey Director, Nuclear Safety GDB:JWK:pam

Enclosures:

1 Response to NRC Conuents (5 cys) 2 WNP-2 Safeguards Contingency Plan (5 cys) 3 WNP-2 Physical Security Plan (5 cys) 8104020)q

l STATEOFWASHINGTON)

Subject:

bcveth 9lw d

) ss COUNTY OF BENTON

)

I, G. D. BOUCHEY, being duly sworn, subscribe to and say that I am the Director, Nuclear Safety, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEti, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of ny knowledge, infonnation and belief the statements made in it are true.

DATED W ar. R 7

, 1981 h% %S G. D. BOUCHEY d

On this day personally appeared before me G. D. BOUCHEY to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this Z7 day 'of /7M4 Ci/

1981.

0 W ll Y LY Notary Public/in and for the State of Washington Residing at 2 k A//ur[, b t

5 e

~