Confirms 810310 Discussion Re 800814 Immediate Action Ltr on Unit 2 Small Bore Piping Installation.Agreed That Util May Proceed W/Installation Work Provided Detailed Record Maintained
ML20003D998
Person / Time
Site: LaSalle 
Issue date: 03/19/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8104020002
Download: ML20003D998 (1)


Text

(

00 UNITED ST ATES

/ " Cut,[*,,

NUCLE AR REGULATORY COMMISSION REGION ill ie o

f 799 ROO$cvEtt RO AD y

aten ettvu, stuNOl$ 6007 MAR 19' 1981' f

W Uf sv ell [l'I[p Q

Docket No. 50-374 f

Commonwealth Edison Company

]

gg ' 3 f[]g7 ATTN:

Mr. Cordell Reed

, c, -

b 9)

'Nory W **

Vice President Post Of fice Box 767 Chicago, IL 60690

'k

(

/

Gentlemen:

t This refers to the discussion between Mr D21 George of your organization and Mr. Reimann of my staf f on March 10, 1981, regarding the Immediate Action Letter (IAL) dated August 14, 1980, which af fected work on LaSalle County Station, Unit 2 small bore piping installation.

It was agreed that Commonwealth Edison Company may proceed with Unit 2 small bore piping design and installation work which was af fected by the IAL provided that a detailed record be maintained, on not less than a weekly basis, documenting piping and supports which were worked on during the report period.

The detailed records of work will be necessary for our review of your actions pursuant to the I AL during future inspections.

Please inform us if your understanding of the above agreement is dif ferent from that stated above.

Since rely, Al f'( James G. Keppler V

Directo r cc:

J. S. Abel, Dir. of Ncl. Lic.

L. J. Burke, Site Cons t.

Spvr.

T. E. Quaka, QA Spyr.

R. H. Ilolyoak, Stat. Supt.

B. B. Stephenson, Pj ct. Mg r.

Central Files Reproduction Unit NRC 20b AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Mary Jo Murray,0f fice of Assistant Attorney General 8104 0 2 0 00a A