Summary of 810204 Meeting W/Util Re Facility Startup Schedule
ML20003D955
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/17/1981
From: Kintner L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8104010609
Download: ML20003D955 (3)


Text

a

+f UNITED STATES f

g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20656 g

p

\\*..../

MAR 171981 Docket No. 50-364 LICENSEE: Alabama Power Company FACILITY: Farley 2

SUBJECT:

Su MARY OF FEBRUARY 4, 1981 MEETING REGARDING FARLEY 2 STARTUP SCHEDULE Representatives of Alabama Power Company (R. P. Mcdonald, O. Kingsley and G. Hairston) met with the staff in the Division of Licensing (D. G. Eisenhut, R. L. Tedesco, A. Schwencer and L. L. Kintner) to provide reasons for the delay in plant startup and to provide an updated plant startup schedule.

On September 3,1980, when the Commission met to consider a fuel loading and low power testing license, the estimated fuel loading date was late September 1980.

In January 1981, the estimated fuel loading date was March 8, 1981. The major reason for the more than 5 month delay was that the modifica-tions to pipe hangers were more extensive than anticipated. Lesser reasons were that the simultaneous refueling shutdown of Unit 1 and modifications to masonry walls placed an added burden on engineering, construction supervisory and management personnel, requiring these persons to divide their time between the two units. Licensee's summary of the meeting is provided in their February 6, 1981 letter to Mr. D. G. Eisenhut.

1 D'

r dan. '

wtm Lester L. Kintner, Project Manager Licensing Branch No. 2 Division of Licensing cc: See next page l

8104010609 6

r Mr. F. L. Clayton, Jr., Senior Vice 8

President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 cc: Mr. W. O. Whitt Executive Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 Mr. Ruble A. Thomas Vice President Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Mr. George F. Trowbridge Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 Mr. W. Bradford NRC Resident Inspector P. O. Box 1814 Dothan, Alabama 36302

o.

MEETING SUPNARY Dl! TRIBUTION Docket File D. Huller NRC PDR R. Bc11ard Local PDR W. Rtgan NSIC D. R(ss s

to TIC /

P. Clack 5$' gf'u A

TERA R. Sitterfield 7

,r LB #2 File.

O. Parr Wa2 /Sg7A s

g ',

y,4 F. Rcsa g g.L H. Denton W. Bt.tler i

6

\\

E. Case W. Kieger D. Eisenhut R. H(uston

\\%

R. Purple T. Mt.rphy

\\

p#

B. J. Youngblood L. Rooenstein.

~~-

A. Schwencer T. SIeis F. Miraglia W. Jciinston J. Miller J. Stalz G. Lainas S. Heaauer R. Vollmer W. Ga. mill J. P. Knight F. Scnroeder R. Bosnak D. Skavholt F. Schauer M. Er.1st R. E. Jackson R. Baer Project Manager L. Kintner C. Bc-linger Licensing Assistant MService K. Kr.iel i

Attorney, OELD G. Knighton 18E (3)

A. Thidani ACRS (16)

D. Toidi R. Tedesco D. Vaisallo G. Lear

' J. Kramer V. Noonan P. Collins S. Pawlicki D. Ziemann V. Benaroya S. Ra nos Z. Rosztoczy S. Sc'iwartz W. Haass NRC

Participants:

Other,1 t

BCC: Applicant & Service List l

r.