ML20003D548

From kanterella
Jump to navigation Jump to search
Informs of Delay in Submittal of Application for Tech Spec Amend Re Snubber Surveillance,Per NRC 801120 Request.Delay Caused by Problems W/Hydraulic Snubbers.Application Currently Scheduled for Submittal by 810501
ML20003D548
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/20/1981
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NO-81-509, NUDOCS 8103270649
Download: ML20003D548 (2)


Text

I %,, s

' i..

~ _

g S 37]

~

q hk/

m%gq <{9

/i March 20, 1981 g,,g

%2

)

\\/~

L.O File: NG-3514(E)

Serial No.:

NO-81-509 Office of Nuclear Reactor Regulation ATTENTION:

Mr. T. A. Ippolito, Chief Operating Reactors Branch No. 2 United States Nuclear Regulatory Commission Washington, D. C.

20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DTR-62 TECHNICAL SPECIFICATIONS FOR SNUBBER SURVEILLANCE

Dear Mr. Ippolito:

=

Background===

This is in regard to Mr. D. G. Eisenhut's November 20, 1980 letter concerning Inservice Surveillance Requirements for snubbers under Standard Technical Specifications. This letter requested that each licensee submit a license amendment application to incorporate applicable portions of model Technical Specifications into Appendix "A" Technical Specifications.

Status Carolina Power & Light Company (CP&L) reviewed the model Technical Specifications transmitted by Mr. Eisenhut's letter as they apply to the Brunswick Steam Electric Plant (3SEP) Unit Nos. 1 and 2.

CP&L was preparing the license amendment application to revise the Brunswick Technical Specifications when a routine functional test of snubbers on Unit No. 2 revealed what a'ppears to be a significant problem with the hydraulic snubbers (refer to LER 2-81-41).

CP&L feels that we must analyze the current snubber problem in conjunction with the technical specifications changes to assure that our license amendment submittal is thorough.

(ODl 0

_.3 8103270649 72

1 Schedule The problem analysis should be cor, ted in ti:ne to support our submittal of the requested technical specn ications changes by May 1, 1981.

Please contact my staff should you have any questions con-cerning this information.

Yours very truly,

[

E. E. Utley Executive Vice President Power Supply and Engineering & Construction RMP/JM/je (0575)