ML20003D437
| ML20003D437 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/13/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20003D438 | List: |
| References | |
| NUDOCS 8103270132 | |
| Download: ML20003D437 (2) | |
See also: IR 05000424/1981004
Text
?
- e
R U4
-
[gb
- 'o
UNITED STATES
'
l'
NUCLEAR REGULATORY COMMISSION
[
3,q
i
e
REGION 11
o
J
101 MARIETTA ST.. N.W.. SUITE 3100
.V
ATLANTA. G Eo RG{A .3o3o3
MAR 14 con
p ,J p
.....
9
,
d
,
Georgia Power Company
.2
'44ff,i ,
7,,
d pg b j==
%
/
ATTN:
J. H. Miller, Jr.
-
Executive Vice President
D
g% %
270 Peachtree Street
s
-'
Atlanta, GA 30303
%
Y
~
k
d *. s \\
Gentlemen:
Suoject: Report Nos. 50.-424/81-04 and. 50-425/81.-04
This refers to the routine safety inscection conducted by S. R. Crowley of this
office on February 13-20, 1981, of activities autnori::ed by NRC Construction
Permit Nos. CPPR-108 and CPPR-109 for the Vogtle facility.
Our preliminary
findings were discussed with K. M. Gillespie at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Durinn th inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously reported
unresolved items. .The status of these items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this lettar and the enclosed inspec-
tion report will be pla'ced in the NRC' Public Occument- Room.
If this report
contains any information that you believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withhold such
.
information from public disclosure. Any sucn application must incluce tne casis
l
for claiming that the information is proprietary and the proprietary information
l
should be contained in a separate part of the document. If we do not hear from
you in this regard within the.specified period, the report will be placed in the
,
Public Document Room.
'
p03p OM
,
_
- .
.
.
_ '
MAR I3 19 3 ;
Georgia Power Company
2
Should you have any questions concerning this letter, we will be glad to ciscuss
them with you.
Sincerely
1
.
t
-
tl
%
I
'
. . ..wi s ( Acting Di rector
.
Division of Resident and
Reactor Project Inspection
-
.
-
- ,; Enclosures:
'
.c i-
,
- .
_.
..
.
' '
1.
Aopendix A, Notice of Violation
2.
Inscection Report Nos. 50-424/S1-04
and 50-425/81-04
cc w/ enc 1:
K. M. Gillespie, Construction
Project Manager
.E. D. Groover, QA Site Supervisor
D. E. Dutton, Project General Manager
.
.
.
t
gb
J
e
,
~
e
i
, %n
.
4
g
,
.d
g
,
T
4
b
g-
y
y
' %
wi.2.