Forwards IE Insp Rept 50-458/80-13 on 801101-1231 & Notice of Violation
ML20003D333
Person / Time
Site: River Bend 
Issue date: 02/06/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Draper E
GULF STATES UTILITIES CO.
Shared Package
ML20003D337 List:
References
NUDOCS 8103260516
Download: ML20003D333 (2)


See also: IR 05000458/1980013

Text

I

-/J .

[# *%,

UNITED STATES

NUCCEAR F;EGULATORY COMMISSION

y

g

,

. y[/. j

REGION IV

611 RYAN PLAZA DRIVE. SUITE 1000

\\' ,,[.[,8

ARLINGTON. TEXAS 76011

February 6, 1981

In Reply Refer To:

v./g,?I<g

RIV

9

Docket No. 50-458/Rpt. 80-13

/

N

42J

4

-

.

(@9

Gulf States Utilities

  • . 4

ATTN: Dr. E. Linn Draper, Jr.

'

lat.

'

Vice President - Technology

Post Office Box 2951

Beaumont, Texas 77704

g

,

,

Gentlemen:

This refers to the inspection activities performed by our Resident Reactor

Inspector, Mr. A. B. Beach, during the period November and December 1980,

of activities authorized by NRC Construction Permit No. CPPR-145 for River

Bend, Unit No.1, and to the discussion of our findings with Mr. T. C. Crouse

and other members of your staff during the inspection period.

This is the initial report issued as a part of the USNRC Resident Inspection

Program at the River Bend Nuclear Generating Station. A Reactor Resident

Inspector (RRI) will remain on site on a full time baiis throughout the

construction phase of the project.

Areas examined during the inspection and our findings are discussed in the

l

enclosed inspection report. Within these areas, the inspection consisted

'

of selective examination of procedures and representative records, inter-

views with personnel, and observations by the inspector.

During this inspection, it was found that certain of your activities were

,

!

not conducted in full compliance with NRC rcluirements. Consequently, you

l

are required to respond to this matter, in writing, in accordance with the

I

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2.

Title 10, Code of Federal Regulations. Your response should be based on

the specifics contained in the Notice of Violation attached to this letter.

l

We have also examined actions you have taken with regard to previously identi-

fied inspection findings. The status of these items is identified in paragraph

!

2 of the enclosed report.

Two new unresolved items are identified in paragraphs 3 and 6 of the enclosed

report.

Information with regard to investigative effort on two allegations is contained

in paragraph 9 of the enclosed report.

.

810 3 260$4

9

./

_

_

_

_

_

_ __

__

__

__

'

,

Gulf States Utilities

-2-

February 6,1981

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 25 days

of the date of this letter, requesting that sucn information be withheld from

public disclosure. The application must include a full statement of the reasor.s

why it is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Rcom.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

.,

to discuss them with you.

Sincerely,

/ f

b

W. C. Seidl'es Chief

Reactor Con h uction and

,

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

IE Inspection Report No. 50-458/80-13