Framatome Richland Facility Emergency Plan Version 15.0 Transmittal to USNRC Headquarters Document Control Desk
ML20003D291
Person / Time
Site: Framatome ANP Richland
Issue date: 12/10/2019
From: Deist J
Framatome
To:
Document Control Desk, Office of Nuclear Security and Incident Response
Shared Package
ML20003D293 List:
References
JMD:19:034
Download: ML20003D291 (1)


Text

framatome December 10, 2019 JMD:19:034 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Office of Nuclear Security and Incident Response One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738

Subject:

Gentlemen; Framatome Richland Facility Emergency Plan Version 15.0 Transmittal to USNRC Headquarters Document Control Desk Enclosed is a CD-ROM that includes the latest revisions of the Framatome Richland Facility's Emergency Plan (E08-01-1.0), Emergency Plan Implementing Procedures (E08-03-X.XX), and Memoranda of Understanding (E08-04-X.XX). The document number designations X.XX" are used to encompass all applicable document numbers, e.g. E08-03-1.1, E08-03-2.1, E08-03-3.11, etc. For your convenience, I have enclosed a document summary in hard copy. This summary includes a listing of folders, files, and document numbers and titles that are included on the CD-ROM. An electronic copy of the summary is included in the root directory of the disc.

Please destroy any previous copies of these documents that you still have on file.

10 CFR 70.32(i) requires emergency plan revisions to be furnished to the USN RC within six months after changes are made. On 11/06/2019, the Framatome Richland Emergency Plan (E08-01-1.0) was revised to version 15.0, which is the current revision. A nature of change listing and the electronic signature page is enclosed with this letter. Changes made in version 15.0 do not decrease the effectiveness of the plan.

Therefore, USNRC pre-approval of version 15.0 is not required.

Additional copies are being sent to Framatome Richland's USNRC Project Manager (Osiris Siurano-Perez), USNRC Region II (Richard Gibson), and the USN RC Senior Resident Inspector at Columbia Generating Station (Gregory Kolcum).

If you have questions regarding this transmittal, please contact me at (509) 375-8285 or via email at jeff.deist@framatome.com.

Very truly yours,

~

Jeffrey M. Deist, Emergency Preparedness Coordinator Environment, Health, Safety & Licensing Enclosure Framatome Inc.

2101 Horn Rapids Road Richland. WA 99354 Tel: (509) 375-8100 www.framatome.com