Forwards IE Insp Rept 50-289/81-02 on 810105-09.No Noncompliance Noted
ML20003D104
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/28/1981
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
METROPOLITAN EDISON CO.
Shared Package
ML20003D105 List:
References
NUDOCS 8103190288
Download: ML20003D104 (2)


See also: IR 05000289/1981002

Text

.

. .

4W

"%

j#"

4

us:Teo STATES

1

NUCLEAR REGULATORY COMMisslON

e

.,

lI )

.I j

'

nEciou s

@

.

'g

631 PARK AVENUE

KING O F PRUSSI A, PENNSVI.V ANI A 1940G

,

28JAN iS87

Docket No. 50-289

C

hV/

1

Metropolitan Edison Company

ATTN: Mr. H. D. Hukill

4

E" ,,'/g 2 6 Jgg7 ' 7

3

Vice President and Director, TMI-1

M

/

%pg* JO'

P. O. Box 480

Middletown, Pennsylvania

17057

.g

,

Gentlemen:

s

Subject:

Inspection No. 50-289/81-02

This refers to the routine inspection conducted by Mr. A. D. Sassani, Jr. of

this office on January 5-9, 1981 at the Three Mile Island Nuclear Station,

Unit 1, Middletown, Pennsylvania of activities authorized by NRC License No.

DPR-50 and to the discussions of our findings held by Mr. A. D. Sassani, Jr.

with Mr. L. W. Harding of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of -this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

. Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

8103190 M s

.

,

Metropoiltan Edison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

v

.( >

g/

. Carlso(RT-Chieff f

A 6 =^

Robert

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report No. 50-289/81-02

cc w/ encl:

R. J. Toole, Manager, TMI-1

<

L. W. Harding, TMI-1 Licensing Supervisor of Licensing

E. G. Wallace, PWR Licensing Manager

B. Ballard, QA Modification / Operations Manager

J. B. Libernan, Esquire

G. F. Trowbridge, Esquire

Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without

Report)

,

- . . -