ML20003D104
| ML20003D104 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/28/1981 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Hukill H METROPOLITAN EDISON CO. |
| Shared Package | |
| ML20003D105 | List: |
| References | |
| NUDOCS 8103190288 | |
| Download: ML20003D104 (2) | |
See also: IR 05000289/1981002
Text
.
. .
4W
"%
j#"
4
us:Teo STATES
1
NUCLEAR REGULATORY COMMisslON
e
.,
lI )
.I j
'
nEciou s
@
.
'g
631 PARK AVENUE
KING O F PRUSSI A, PENNSVI.V ANI A 1940G
,
28JAN iS87
Docket No. 50-289
C
hV/
1
Metropolitan Edison Company
ATTN: Mr. H. D. Hukill
4
E" ,,'/g 2 6 Jgg7 ' 7
3
Vice President and Director, TMI-1
M
/
%pg* JO'
P. O. Box 480
Middletown, Pennsylvania
17057
.g
,
Gentlemen:
s
Subject:
Inspection No. 50-289/81-02
This refers to the routine inspection conducted by Mr. A. D. Sassani, Jr. of
this office on January 5-9, 1981 at the Three Mile Island Nuclear Station,
Unit 1, Middletown, Pennsylvania of activities authorized by NRC License No.
DPR-50 and to the discussions of our findings held by Mr. A. D. Sassani, Jr.
with Mr. L. W. Harding of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of -this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must be accompanied by an affidavit executed by the owner of the
information, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the items
which will be considered by the Commission as listed in subparagraph (b) (4) of
. Section 2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
8103190 M s
.
,
Metropoiltan Edison Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
v
.( >
g/
. Carlso(RT-Chieff f
A 6 =^
Robert
Reactor Construction and Engineering
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report No. 50-289/81-02
cc w/ encl:
R. J. Toole, Manager, TMI-1
<
L. W. Harding, TMI-1 Licensing Supervisor of Licensing
E. G. Wallace, PWR Licensing Manager
B. Ballard, QA Modification / Operations Manager
J. B. Libernan, Esquire
G. F. Trowbridge, Esquire
Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without
Report)
,
- . . -